Less Than One Acre SWPPP Template - SDCCD 20100805

LESS THAN ONE ACRE (LTA) SWPPP TEMPLATE

    FOR SAN DIEGO COMMUNITY COLLEGE DISTRICT (SDCCD) CONSTRUCTION MANAGEMENT PROGRAM

Prepared for

    San Diego Community College District

    2275 Camino Del Rio South

    San Diego, CA 92108-3883

URS Project No. 27679101.06010

    Consultant Agreement # 2634, Stormwater Design and Management Services

Patricia T. Samora, P.E.

    Project Manager

    August 5, 2010

1615 Murray Canyon Road, Suite 1000

    San Diego, CA 92108-4314

    Telephone: 619.294.9400

    Fax: 619.293.7920

    LTA SWPPP 1

    INSTRUCTIONS FOR PREPARING THE LTA SWPPP:

    ; This LTA SWPPP is only for projects with land disturbances of less than one acre or no soil

    disturbance. For projects with land disturbances of an acre or greater refer to the SDCCD’s

    SWPPP template.

    ; The SWPPP preparer shall complete all yellow highlighted sections with project specific details.

    It is recommended that yellow highlighting be removed once the document is finalized and

    submitted for signature.

    ; Additonal instructions for completing the SWPPP are located throughout the document in blue

    text. All blue text should be deleted from the document once finalized and submitted for

    signature.

    ; The Title Page shall have the following information:

    o Project name;

    o Contractor ID number and name;

    o Date LTA SWPPP was prepared;

    o Signed and dated by David Backensto, Property Agent;

    o Fill in project name and location in the page header.

    ; The Project Information and Signature Page shall have the following information:

    o Project start date;

    o Contractor name, address, and phone number;

    o A detailed description of the work to be conducted, including size of project, demo

    work, construction, and any significant details about the project;

    o Project work location;

    o Name, signature, telephone number, fax number, and email address of the Qualified

    SWPPP Iimplementor (QSI) chosen for the project.

    o Name, signature, telephone number, fax number, and email address of the person

    who prepared the LTA SWPPP.

    ; The QSI shall have formal storm water management training as described under Training in the

    template.

    ; Attach a Location Map and Project Site Map for the project, with the required elements listed on

    page 2 of the template, to the LTA SWPPP.

    ; Complete Tables A-1 thru A-6 with the BMPs that will be used for the project site. Each of the

    BMPs with the dark hashed shading are required BMPs and shall be used for the project site. If

    these BMPs are not applicable due to site conditions, uncheck the block and explain why they

    were not selected. At least one of the BMPs with the vertical striped shading shall be used on

    site, at the descretion of the contractor based on site conditions and constraints. If the SWPPP

    preparer feels the need to designate one of these BMPs due to site conditions, the use of the

    BMP should be specified and the footnotes edited as appropriate. If these BMPs are not

    applicable, this should be indicated and the table edited as appropriate.

    All of the columns in a table associated with a BMP being used on site shall be completed for

    that BMP.

    ; Add additional site specific BMPs to be used for the project in the space provided at the end of

    each of the BMP sections in the template. This space may also be used to further discuss

    BMPs identified in the tables and their use for the project.

    2 LTA SWPPP

    ; Table A-7 should only be completed by the QSI in the event of any petroleum products or

    sewage release that enters a storm drain or receiving water.

    ; Attach the California Stormwater Quality Association (CASQA) Stormwater BMP

    Handbook Portal: Construction BMP fact sheets that correspond to the BMPs selected for

    the site. Avoid including all the BMPs as this LTA SWPPP should be tailored to the specific

    requirements of the project site. The CASQA BMP Factsheets are used based on the limited

    pre-permission copyright granted to the SDCCD SWPPP signatory for use in SWPPPs

    prepared for SDCCD facilities management projects. All other uses are prohibited and may be

    a violation of Federal Copyright Law.

    LTA SWPPP 3

This page is intentionally left blank

4 LTA SWPPP

    LESS THAN ONE ACRE STORMWATER

    POLLUTION PREVENTION PLAN

    (LTA SWPPP)

    FOR LAND DISTURBANCES OF

    LESS THAN ONE ACRE OR NO SOIL DISTURBANCE

PROJECT:

    CONTRACT ID NUMBER:

    CONTRACTOR NAME:

    DATE:

    Prepared for:

    San Diego Community College District

    3375 Camino del Rio South

    San Diego, CA 92108 Prepared By:

     Date:

     Name of SWPPP Preparer, Qualifications, and Company

    Approved by San Diego Community College District:

     Date:

     David Backensto, Property Agent, Facilities Management

LTA SWPPP 5

    ?ProjectName? ?Location?

    SAN DIEGO COMMUNITY COLLEGE DISTRICT SWPPP

    PROJECT INFORMATION AND SIGNATURE PAGE

    This Less Than One Acre (LTA) Stormwater Pollution Prevention Plan (SWPPP) shall be effective immediately upon approval by the San Diego Community College District (SDCCD) and signature of the Qualified SWPPP Implementer (QSI). The person listed as the QSI shall be responsible for ensuring that the elements of this plan are implemented. Project Start Date:

    Contractor Name:

    Address: _____________________________________________

     ____________________________________________________________

    Phone: _________________

    Detailed Work Description:______________________________________________________

Work Location:__

    Qualified SWPPP Implementer (QSI):_____________________________________________

     Signature: ______________________________

     Telephone: _________________________________

     Fax:_______________________________________

     Email:_____________________________________

    Preparer of SWPPP: _____________________________________________________

     Signature:

     Telephone:

     Fax:

     Email:

    LTA SWPPP 7

?ProjectName? ?Location?

    SWPPP AMENDMENTS OR REVISIONS # Section Summary of Revision Date Name/Title and Page

    8 LTA SWPPP

    ?ProjectName? ?Location?

    Location Map and Water Pollution Control Drawings

    The Location and Water Pollution Control Drawings (WPCDs) for this project are attached to this LTA SWPPP and include the following elements, required by the SDCCD:

Location Map

     Vicinity basemap.

     Boundaries of proposed construction activity.

     Construction area shaded and label project site.

     North arrow and scale.

    Project Site Map (WPCD)

     An area extending 50' beyond the perimeter of the work area.

     Boundaries of the actual construction site.

     Vehicle and equipment parking areas.

     Areas to be used to store soils, construction materials, and wastes, including loading and

    unloading areas.

     Areas of non-soil disturbing activities with the potential to impact water quality (painting, abrasive

    blasting, etc.).

     Areas of cut and fill.

    1 Outlines of all areas of soil disturbance that will be stabilized during the rainy season.

     Outlines of all areas of soil disturbance that will not be stabilized during the rainy season. Locations of storm water run-on and discharge from the construction site. Locations of storm water conveyance(s) (e.g., drain inlets, trenches, channels) on site and any

    offsite that may be impacted by project.

     Locations of non-storm water discharge (if recurring and if known).

     Existing graded condition and final graded condition (if the work will alter the existing landform). Drainage patterns and slopes of the existing and ultimate graded condition, as appropriate. Areas of existing vegetation to be preserved.

     Location of primary site vehicle and equipment entrance and exit points. Area to be used for vehicle equipment fueling and service/maintenance.

     Proposed construction BMPs and where they will be installed.

     1 The rainy season is defined as October 1 through April 30.

    LTA SWPPP 9

?ProjectName? ?Location?

Insert Vicinity Map

10 LTA SWPPP