Station: BHEL Ref No:

    NTPC- Rihand PW/TSX/RIT/TUR-PR/001/REV00

    Plant area: Document- Type

    CONDENSER ERECTION MANUAL Revalidated document prepared based on doc, BHEL/PSNR/TSX/VSTPP/TA-08 for internal use.

    ERECTION MANUAL FOR CONDENSER

    RIHAND # 3&4 - 500 MW

    Issued to Date of Issue

    TN VARDARAJAN/ CM/RIHAND

    Prepared By Reviewed by Approved by Issued by

    O. D.SHARMA D K SHRIVASTAVA ML SAH B.P.RAO Sr.Mgr./ TS/PSWR SDGM/TSX/PSWR GM/TSX & SAS/PSWR Head/TSX

    1

POWER SECTOR-WESTERN REGION TECHNICAL SERVICES NAGPUR-440 001

Station: BHEL Ref No:

    NTPC- Rihand PW/TSX/RIT/TUR-PR/001/REV00

    Plant area: Document- Type

    CONDENSER ERECTION MANUAL

    Revalidated document prepared based on doc, BHEL/PSNR/TSX/VSTPP/TA-08 for internal use.

    PREFACE

    The erection manual of condenser for Rihand 3&4- 500 MW project provides guidelines for erection of Condenser. The procedure may require some minor alterations at site to meet the local site conditions.

    BHEL reserves the right to adopt alternate procedure, if necessasity arises.

    Feed back and suggestions from the users/task performers are solicited for further improvements.

    2

POWER SECTOR-WESTERN REGION TECHNICAL SERVICES NAGPUR-440 001

Station: BHEL Ref No:

    NTPC- Rihand PW/TSX/RIT/TUR-PR/001/REV00

    Plant area: Document- Type

    CONDENSER ERECTION MANUAL Revalidated document prepared based on doc, BHEL/PSNR/TSX/VSTPP/TA-08 for internal use.

    CODIFICATION

     FOR

    INSTRUCTION NUMBER

    3

POWER SECTOR-WESTERN REGION TECHNICAL SERVICES NAGPUR-440 001

    Station: BHEL Ref No:

    NTPC- Rihand PW/TSX/RIT/TUR-PR/001/REV00

    Plant area: Document- Type

    CONDENSER ERECTION MANUAL

    Revalidated document prepared based on doc, BHEL/PSNR/TSX/VSTPP/TA-08 for internal use.

The following codification system is used for numbering of instructions and the

    codification of Log sheets is as per FAQ document.

XX X XX XX XX X

    Alpha Numeric Numeric Numeric Numeric Alpha

     Type of

     Instruction

     System Instuction No.

     System Designation

     Rating of Main Equipment

     Type of Manual

    Product Code

1.1 Product Code

     B - Boiler

     BA - Boiler Aux.

     T - Turbine

     TA - Turbine Aux.

     G - Generator

     GA - Generator Aux.

     P - Power Plant Piping

     CI - C&I

    4

    POWER SECTOR-WESTERN REGION TECHNICAL SERVICES NAGPUR-440 001

    Station: BHEL Ref No:

    NTPC- Rihand PW/TSX/RIT/TUR-PR/001/REV00

    Plant area: Document- Type

    CONDENSER ERECTION MANUAL

    Revalidated document prepared based on doc, BHEL/PSNR/TSX/VSTPP/TA-08 for internal use.

1.2 Type of Manual

     1. - Erection

     2. - Commissioning

     3. - Services

1.3 Rating of Main Equipment

    01. - 200/210 MW

    02. - 120 MW

     03. - 110 MW

     04. - 60 MW

     05. - 30 MW

     06. - 100 MW

     07. - 235 MW

     08. - 500 MW -KWU Design

     09. - 210 MW -KWU Design

     10. - 120 MW -KWU Design

     11. - 60 MW -KWU Design

     12. - 70MW -KWU Design

     13. - Industrial Units

     14. - 210 MW -Tower Type Concrete Pylem

     15. - 210MW -Tower Type Steel Structure

     16. - 500MW -Tower Type Once Through

     17. - 250MW

    18. - CCP

    5

    POWER SECTOR-WESTERN REGION TECHNICAL SERVICES NAGPUR-440 001

    Station: BHEL Ref No:

    NTPC- Rihand PW/TSX/RIT/TUR-PR/001/REV00

    Plant area: Document- Type

    CONDENSER ERECTION MANUAL

    Revalidated document prepared based on doc, BHEL/PSNR/TSX/VSTPP/TA-08 for internal use.

1.4 System Designation

     01 - General Instuction

     02 - Technical Data

     03 - Erection Strategy - Condenser

    04 - Erection Procedure- Condenser

1.5 System Instuction No.

     01 - General Description

     02 - Technical Data

     03 - Erection Strategy - Condenser

     04 - Erection Procedure - Condenser

1.6 System Instruction No.

     01 - General Instruction

     02 - Technical Data

     03 - Erection Strategy - Condenser

     04 - Erection Procedure - Condenser

1.7 Type of Instruction

     G - General

     T - Technical

     L - Log Sheet

    C - Check List

    6

    POWER SECTOR-WESTERN REGION TECHNICAL SERVICES NAGPUR-440 001

Station: BHEL Ref No:

    NTPC- Rihand PW/TSX/RIT/TUR-PR/001/REV00

    Plant area: Document- Type

    CONDENSER ERECTION MANUAL Revalidated document prepared based on doc, BHEL/PSNR/TSX/VSTPP/TA-08 for internal use.

    INDEX

    7

POWER SECTOR-WESTERN REGION TECHNICAL SERVICES NAGPUR-440 001

    Station: BHEL Ref No:

    NTPC- Rihand PW/TSX/RIT/TUR-PR/001/REV00

    Plant area: Document- Type

    CONDENSER ERECTION MANUAL

    Revalidated document prepared based on doc, BHEL/PSNR/TSX/VSTPP/TA-08 for internal use.

    INDEX

     S. NO. DESCRIPTIONINSTN NO.

     1. GENERAL DESCRIPTION TA1-08-0101G

     2. TECHNICAL DATA TA1-08-0202G

     3. ERECTION STRATEGY TA1-08-0303G

     4. ERECTION PROCEDURE TA1-08-0404G

5. LIST OF DRAWINGS

    8

    POWER SECTOR-WESTERN REGION TECHNICAL SERVICES NAGPUR-440 001

Station: BHEL Ref No:

    NTPC- Rihand PW/TSX/RIT/TUR-PR/001/REV00

    Plant area: Document- Type

    CONDENSER ERECTION MANUAL Revalidated document prepared based on doc, BHEL/PSNR/TSX/VSTPP/TA-08 for internal use.

     GENERAL DESCRIPTION

    9

POWER SECTOR-WESTERN REGION TECHNICAL SERVICES NAGPUR-440 001

Station: BHEL Ref No:

    NTPC- Rihand PW/TSX/RIT/TUR-PR/001/REV00

    Plant area: Document- Type

    CONDENSER ERECTION MANUAL

    Revalidated document prepared based on doc, BHEL/PSNR/TSX/VSTPP/TA-08 for internal use.

1.0 INTRODUCTION

     The condenser is a box type construction with divided water box design double flow; two pass which facilitates the operation of one half of the condenser while other half is under maintenance. The steam space is of rectangular cross-section with integral air-cooling section from where air and noncondensable gases are drawn out with the help of air evacuation equipment.

2.0 CONSTRUCTION

    2.1 The surface condenser is mounted on spring supports. The condenser is welded with the exhaust hood of the low-pressure turbine. The tube plates are welded with the water chambers. Condensers are provided with domed shape water box. The condenser tubes are supported within the condenser shell by tube support plates, which are so spaced that the vibrations of the tubes are prevented under normal operating conditions. The condenser is installed in such a way that all condenser tubes are drained automatically into the condenser water boxes.

    2.2 NECK

    Condition has been provided with an extension suitably to connect it to the turbine exhaust opening. Adequate internal clearance is provided. The rigid construction results in a sound-condenser combination for trouble free operation.