    Current requirements third countries (updated until 25 October 2005)

     Country Heat treatment Methylbromide Other Remarks (HT) (MB) methods

    Phytosan. Treatment Phytosan. Treatment Requirement Requirement certificate Report Certificate Report

    Argentina As of 1 June 2005 in None None Unknown conformity with ISPM 15

    If not in conformity with ISPM 15 and Australia currently accepts wood packaging ; ISPM 15 is being additional for containerised cargo according to ISPM accepted if wooden conditions: the 15. Australia now proposes to extend the packing material is 21 day rule for Longer treatment adoption of ISPM 15 to cover all wood bark-free and includes non-permanent period packing material and dunnage used in Australia a packing declaration None treatment (24 hours); for the rest None None supporting, protecting or carrying break per consignment; or methods does in conformity with bulk and air cargo imported into Australia. apply and a ISPM 15. For countries unable to comply with ISPM ; With a minimum of treatment 15, Australia will continue to accept 74?C during at least 4 report and packaging which meets existing AQIS hours packing requirements for containerised cargo only. declaration are required As of 23 July 2005 only debarked wood packaging Bolivia material Non treated wooden Non treated wooden packing material needs to packing material be bark free and free of needs to be bark free Brazil plant diseases; and free of plant As of 16 September 2005 in diseases conformity with ISPM 15 As of 1 June 2005 only debarked wood packaging - - - - Chili material Phase in implementation since 1 January 2004. In conformity with None None minimum standard of None None Not possible Canada Strict enforcement of ISPM ISPM 15 15 as of 16 September 2005 Chemical Requirements are Pressure more stringent than A minimum of 56?C during Impregnation ISPM 15: Minimum 30 minutes is being acceptable if treatment period of 24 accepted. part of Heat Yes Yes hours (instead of 16 Yes Yes China Treatment hours according to As of 1 January 2006 in and marked ISPM 15) and conformity with ISPM 15 in conformity minimum temperature with ISPM Ofor treatment is 5C 15

    Current requirements third countries (updated until 25 October 2005) -2

     Country Heat treatment Methylbromide Other Remarks (HT) (MB) methods

    Phytosan. Treatment Phytosan. Treatment Requirement Requirement certificate Report Certificate Report As of 16 September 2005 in - Colombia conformity with ISPM 15 As of 1 January 2005 in None None - - - Costa Rica conformity with ISPM 15

    As of 20 September 2005 None None - - - Ecuador

    As of 16 September 2005 in Guatemala conformity with ISPM 15 Chemical Requirements are Pressure A phytosanitary certificate is not required As of 1 November 2004: in more stringent than Impregnation as long as the wooden packaging material None None None None India conformity with ISPM 15 ISPM 15: 48 g/m3 and acceptable is treated and marked in conformity with O28 C during 32 hours (means ISPM 15 unknown) Final rule has been released which states In conformity with Mexico As of 16 September 2005 in that wood packaging material has to be minimum standard of conformity with ISPM 15 ISPM 15 compliant as of 1 July 2005. ISPM 15 Enforcement as of September 2005.

    ISPM 15 as of 16 April ; Phosphine; 2003; or Yes; Not the Requirements are Yes; Not the Chemical case if wood more stringent than case if wood ; With a minimum of New Pressure has been ISPM 15: 80 g/m3 and has been 70?C during minimum None None Impregnation Zealand treated in minimum temperature treated in of 4 (to 26) hours acceptable if O conformity with of 10 C during 24 conformity with (depending on the part of Heat ISPM 15 hours ISPM 15 thickness of the wood) Treatment

    As of 30 September 2004 Nigeria None None - - - - in conformity with ISPM 15 As of 17 February 2005 in Panama None None - - - - conformity with ISPM 15 As of 1 March 2005 in Peru None None - - - - conformity with ISPM 15 As of 1 June 2005 in Philippines None None - -- - - conformity with ISPM 15

    Current requirements third countries (updated until 25 October 2005) -3

     Country Heat treatment Methylbromide Other Remarks (HT) (MB) methods

    Phytosan. Treatment Phytosan. Treatment Requirement Requirement certificate Report Certificate Report US Wood Packaging USA Standards to be phased in (United States of 16 September 2005 was America) supposed to be the implementation date for new federal requirements Phase I : informed compliance -- basically governing the importation written warnings between 16 September into the United States of Higher concentrations 2005 and 31 January 2006. Phase II of the wood packaging material in (concentration of at CBP plan calls for enforcement of the conformity with ISPM 15. least 120 g/m3 and Only in the requirements via re-exportation and would Chemical The rules specify that wood total concentration time case if wood be in effect from 1 February through 4 Pressure packaging material be of product of 1920 has not been July 2006 and Phase III full enforcement - None Impregnation - either heat treated or g/hour). Treatment in treated in would commence on 5 July 2006. The (means fumigated with methyl conformity with conformity with United States is enforcing the new unknown) bromide and marked with minimum standard of ISPM 15 standards in cooperation with Mexico and an approved international ISPM 15 is being Canada. Details may be obtained at logo, certifying that the accepted. http://www.aphis.usda.gov/ppq/wpm/imwood packaging material port.html. has been appropriately treated. But the US Customs and Border Protection (CBP) has called for a phased-in schedule of enforcement. For phases: see Remarks.

    South As of 1 March 2005: in - - conformity with ISPM 15 Africa

    South As of 1 June 2005: in - - conformity with ISPM 15 Korea

    ISPM 15 as of 1 March Switzer-2005 land - - (Not for EU and EFTA member states) As of 1 October 2004: new Taiwan import regulations for wood packaging material based on IPPC Standards In conformity with minimum Turkey standard of ISPM 15 is being accepted. ISPM 15 as of 1 January 2006

TWO IMPORTANT REMARKS:

; FEFPEB’s starting point is in any event the information by the official authorities of the various countries.

    ; If ANY INFORMATION IN RELATION WITH ANY COUNTRY IS UNCLEAR, FEFPEB ADVISES YOU TO CONTACT YOUR LOCAL OR NATIONAL

    PHYTOPATHOLOGICAL SERVICES OR VISIT THE RELEVANT WEBSITES. FEFPEB CAN NOT BE HELD RESPONSIBLE FOR ANY