     WI No.: Page:

    TITLE: 标题 页码; WI编号;

     Can Do Report Can do报告 1 / 6 REV.: EFFECTIVITY: WORK INSTRUCTION 有效性 版本 操作指导书

     Overview概述

    Trigger: 目的;

    To generate “Can do” report by Project. 产生各项目的can do 报表

    Can Do report matches sales orders and simulated forecast demand to supply. Demand comes

    Forecast (from inactive Planned Independent Requirements based on Long Term Planning Scenario) .

    Supply comes from WIP Inventory, Shipping Notification, Purchase Orders, QM lot . Demand and Supply

    are prioritized based on requirement (demand) and availability (supply) dates.

    Input - Required Fields Field Value / Comments

    Planning Scenario Enter Planning Scenario Version Number

    Plant Enter Plant code

    Project Enter Project Code

    Procedural Steps

    1.1. Access transaction by:

    Via Menus Via Transaction Code ZCDR

     Note: 注意; PROPRIETARY DOCUMENT受控文件

     May not be reproduced without written permission. 无书面同意不得拷贝

     ICT Department

    ICT部门

     Reference Document Issued Date: Document Control Center Stamp 参考文件: 发布日期: Area: 发布日期: This document is the property of IMI and contains information which is confidential and propriety to IMI. Reproduction or transmittal of its content without written permission from IMI is prohibited

    本文件属于IMI财产,包含机密信息. 禁止无IMI书面批准的

    拷贝和传输.

     WI No.: Page:

    TITLE: 标题 页码; WI编号;

     Can Do Report Can do报告 2 / 6 REV.: EFFECTIVITY: WORK INSTRUCTION 有效性 版本 操作指导书

     1.2 On screen “ZCDR” screen, enter information in the fields as specified in the below table:

    Click to generate the report….

     ** Please open or create another session to prevent interruption during the generation of report,

    it will takes time depends on the allocation and demand requirements that systems works for the

    computation per project inside the system.

    Field Name Description Req. User Action and Values Comments Opt. Cond. Input Parameters Section Header

    Planning Scenario Planning Scenario Version R Enter the version number Plant Plant Code # R Enter plant code #

    Project Project code# R Enter project code # Material Material # O Enter the first 5 digit of the project ( ex. 20012* ) End Date End Date O Enter End date. CRD beyond this date will not be considered in report.

     Note: 注意; PROPRIETARY DOCUMENT受控文件

     May not be reproduced without written permission. 无书面同意不得拷贝

     ICT Department

    ICT部门

     Reference Document Issued Date: Document Control Center Stamp 参考文件: 发布日期: Area: 发布日期: This document is the property of IMI and contains information which is confidential and propriety to IMI. Reproduction or transmittal of its content without written permission from IMI is prohibited

    本文件属于IMI财产,包含机密信息. 禁止无IMI书面批准的

    拷贝和传输.

     WI No.: Page:

    TITLE: 标题 页码; WI编号;

     Can Do Report Can do报告 3 / 6 REV.: EFFECTIVITY: WORK INSTRUCTION 有效性 版本 操作指导书

     Field Name Description Req. User Action and Values Comments Opt. Cond.

    (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

    1.3 Report output on ABAP List Viewer:

    The report can be exported either by detailed or by summary..

    1.3.1. With Display Option: you can export and save the report to local file.

     Click export then local file

     Note: 注意; PROPRIETARY DOCUMENT受控文件

     May not be reproduced without written permission. 无书面同意不得拷贝

     ICT Department

    ICT部门

     Reference Document Issued Date: Document Control Center Stamp 参考文件: 发布日期: Area: 发布日期: This document is the property of IMI and contains information which is confidential and propriety to IMI. Reproduction or transmittal of its content without written permission from IMI is prohibited

    本文件属于IMI财产,包含机密信息. 禁止无IMI书面批准的

    拷贝和传输.

     WI No.: Page:

    TITLE: 标题 页码; WI编号;

     Can Do Report Can do报告 4 / 6 REV.: EFFECTIVITY: WORK INSTRUCTION 有效性 版本 操作指导书

     Choose spreadsheet button then enter or click

    Create file name and the directory you want to save then click

     files already converted..

     Note: 注意; PROPRIETARY DOCUMENT受控文件

     May not be reproduced without written permission. 无书面同意不得拷贝

     ICT Department

    ICT部门

     Reference Document Issued Date: Document Control Center Stamp 参考文件: 发布日期: Area: 发布日期: This document is the property of IMI and contains information which is confidential and propriety to IMI. Reproduction or transmittal of its content without written permission from IMI is prohibited

    本文件属于IMI财产,包含机密信息. 禁止无IMI书面批准的

    拷贝和传输.

     WI No.: Page:

    TITLE: 标题 页码; WI编号;

     Can Do Report Can do报告 5 / 6 REV.: EFFECTIVITY: WORK INSTRUCTION 有效性 版本 操作指导书

    Excel format..

    Note : “IDM should not become a critical gating item” ( the report will only provide “reference”

    information)

    Report Format Details:

    Description Remarks

    1. Material Number FG SAP Material#

    2. Description FG Description

    3. Customer P/N Customer FG Part Number

    4. Demand Type Requirement type ( Forecast)

    5. Required Qty FG qty

    6. FCD FG requirement date

    7. Can do Can do date (Proposed FCD based on material availability and manufacturing leadtime

    8. Level BOM Level

    9. Component SAP Component #

    10. Component Description Item description

    11. Higher-level FG/SFG Summary of components per BOM level

     Note: 注意; PROPRIETARY DOCUMENT受控文件

     May not be reproduced without written permission. 无书面同意不得拷贝

     ICT Department

    ICT部门

     Reference Document Issued Date: Document Control Center Stamp 参考文件: 发布日期: Area: 发布日期: This document is the property of IMI and contains information which is confidential and propriety to IMI. Reproduction or transmittal of its content without written permission from IMI is prohibited

    本文件属于IMI财产,包含机密信息. 禁止无IMI书面批准的

    拷贝和传输.

     WI No.: Page:

    TITLE: 标题 页码; WI编号;

     Can Do Report Can do报告 6 / 6 REV.: EFFECTIVITY: WORK INSTRUCTION 有效性 版本 操作指导书

     Description Remarks

    12. Compo. Reqd qty Is the component required qty x the BOM quantity per assembly

    13. Required date FCD manufacturing leadtime safety time

    14. Buildable Date Date based on longest material availability 15. WIP Available WIP invty issued to prodn

    16. WIP before allocation WIP balance before the allocation

    17. Reqd after WIP Component requirement avail wip

    18. Stock on hand Total inventory

    19. Avail Before Allocation Balance qty before the allocation

    20. Shortage Qty Is the shortage after the allocation from available inventory (unrestricted stocks)

    21. Open Order Allocation allocation of confirmed and unconfirmed open order qty

    22. Supply Type SAP MRP element (confirmed PO, unconfirmed PO , for PR , QM lot)

    23. Buyer / Scheduler Buyers Name or Schedulers Name assigned to a particular materials or FG.

    24. Leadtime Item planned del time / FG in house prodn leadtime ( in days)

    25. Vendor Name Item vendor name

    26. P Order # purchased order # for materials

    27. Order Quantity Quantity based on the P Order

    28. Available date Component confirmation date

    29. Status Status ok , if earlier or equal to component required date / if No , available date does not meet the component required date..

     **END** ******

     Note: 注意; PROPRIETARY DOCUMENT受控文件

     May not be reproduced without written permission. 无书面同意不得拷贝

     ICT Department

    ICT部门

     Reference Document Issued Date: Document Control Center Stamp 参考文件: 发布日期: Area: 发布日期: This document is the property of IMI and contains information which is confidential and propriety to IMI. Reproduction or transmittal of its content without written permission from IMI is prohibited

    本文件属于IMI财产,包含机密信息. 禁止无IMI书面批准的

    拷贝和传输.

Report this document

For any questions or suggestions please email
cust-service@docsford.com