DOC

Installation - S Factor

By Todd Stephens,2014-09-29 00:41
17 views 0
Installation List of Parts Pole (outer - the long one) Slider tube (the short one) Hardware Bag Installation Requirements: Floor to ceiling minimum distance 95.5 inches / maximum 108 inches Tools you will need: 1)Drill 2)Tape measure 3) Safety glasses 4) Stud finder (recommended) 5) Standard screw driver 6) Pliers or adjustable wrenchv Safety is a c..
null
null
null
null

Report this document

For any questions or suggestions please email
cust-service@docsford.com