Sample Quote

By Emma Martin,2014-07-08 10:52
6 views 0
Sample QuoteQuote,quote

    A. Fabrication & Supply of Atm Condenser including shell and end covers

    ; Hot Rolled Naval Brass Tube sheets OD480mm x 25mm Thk x 02 no.

    ; Alu-Brass Tubes: OD16mm x1158mmL x 180pcs

    ; Fix tube Alu Brass OD14mm x 1.mmthk x 6pcs

    ; Baffle Plate: 6mmthk x 1pcs

    ; 14” sch20 Carbon Steel pipe 1250mmL

    ; 14” sch20 Cap 2pcs.

    ; Test Pressure: Shell side 5 bar /Tube Side 5 bar

Our Price for the complete unit S$ 14,750.00

    Less Special Discount 10%: S$13,275.00

    Delivery Time 10 - 12 days upon confirmation,

TERMS & CONDITIONS

    1. Our prices bases on per unit. Exclude any additional restoration work & repair.

    2. Our price based on our normal standard working hours exclude overtime. 3. Validity: 30 days. A W/O & P/O must be issued upon confirmation. 4. Payment: Strictly 30 days. Price to be agreed prior to work commencement. 5. Our price excludes cranage and sea transportation..

A. Fabrication & Supply of New Tube Bundle (Excluding shell and end covers)

    ; Cu / Ni Tubes 3/8” x 1.0mm x 1281mm x 222pcs

    ; Tubesheet 20mmThk x 02pcs

    ; Baffle plate Brass x 03pcs

Our Price for the complete unit S$ 6,500.00

Mobilization/De-Mobilization

    Mobilizes men and necessary tools on board vessel to carry out in-situ retubing job.

    Owner to supply boat launch/boat.

    Total price this item: S$600.00

Retubing for Evaporator:

    Job to be done ion board using Heatecsupplied tubes

    Given Qty = 60, OD19mm x 1.2mm thk and Length = 600mm Alu/Brass Tubes to cut to length and both ends polished.

Our Price $6 x 60pcs = $360.00

Scope of work

    - Inspection on existing unit. Check for choke.

    - Revolution cut on tube end by our revolution cutter. 1” to 2” beyond inner tube sheet.

    - Pull out tubes with hydraulic/pneumatic tube puller. - Random check on tube sheet hole.

    - Insert Heatec supplied Alu-Brass tubes into tube sheet. - Expend both tube ends with auto control torque to achieve 100% mechanical bonding.

    - Later face off access tube ends with face cutter & bell flare. - Conduct hydrostatic testing upon completion.

    Our Lump sum price for complete order: S$1,200.00 (Base on 60 tubes only) Subject to tube sheet condition.

    Exclude of removal of plugs, additional at $5.00 each.

    Delivery time: Approx. 1-2 days subjected to condition of work and barring unforeseen circumstances.

Note: Price excludes remove/refit of evaporator. Please do advise for the flange connection

    for the evaporator for testing.

A. Complete fabrication of Main Eng Air Cooler. Exclude End Covers.

    ; High Performance Block Finned Tubes

    - CuNi (90/10) ASTM B111 C70600 x Ø16.0mm x 2041mmL x 234nos

    - Copper Fin E-Cu58, F25 DIN 1787/40500.1 x 2.4mm pitch x 4 Blocks x 1264mmW

    ; Hot Rolled Tube sheets

    - Naval Brass C46400 x 1354mm x 224mm x 20mmThk x 02no

    ; Mild steel fabricated side panel x 02 nos.

    ; Hydro Testing: On completion, item to be hydrostatic test on tube side @ 5 bar. Our Price USD$14,040.00

    Less Discount 8% = USD$13,000 rdDelivery Time: Deliver out of workshop by 23 Nov

    Delivery Term: Ex-Work Shanghai

    Air freight cost estimate to be USD500-600.

    Agent fees and other cost by owner.

A. Complete fabrication of Main Eng Air Cooler (805m?). Exclude End Covers.

    ; High Performance Block Finned Tubes

    - CuNi (90/10) ASTM B111 C70600 x Ø16.0mm x 1.0mmThk x 1980mmL x 560nos

    - Copper Fin E-Cu58, F25 DIN 1787/40500.1 x 2.2mm pitch x 5 Blocks x 912mm W

    ; Hot Rolled Tube sheets

    - Naval Brass C46400 x 1110mm x 828mm x 25mmThk x 01no

    - Naval Brass C46400 x 995mm x 715mm x 25mmThk x 01no

    ; Mild steel fabricated side panel x 02 nos.

    ; Hydro Testing: On completion, item to be hydrostatic test on tube side @ 5 bar.

    Our COST Price USD$18,500.00

    Delivery Time: 12-14 days upon confirmation.

    Delivery Term: Ex-Work Shanghai

A.Complete retubing of Fresh Water Generator Evaporator.

    * High Performance Tubes: Alu-Brass x Ø19.0mm x 1.0mm thk x 797mmL x 333nos * Hydro Testing: On completion, item to be hydrostatic test on tube side @ 5 bars. Our Price USD$2,700.00

    Delivery Time: 10-12 days upon confirmation.

    Delivery Term: Ex-Work Shanghai

A. Complete fabrication of Main Eng Air Cooler (805m?). Exclude End Covers.

    ; High Performance Block Finned Tubes

    - CuNi (90/10) ASTM B111 C70600 x Ø16.0mm x 1.0mmThk x 1980mmL x 560nos

    - Copper Fin E-Cu58, F25 DIN 1787/40500.1 x 2.2mm pitch x 5 Blocks x 912mm W

    ; Hot Rolled Tube sheets

    - Naval Brass C46400 x 1110mm x 828mm x 25mmThk x 01no

    - Naval Brass C46400 x 995mm x 715mm x 25mmThk x 01no

    ; Mild steel fabricated side panel x 02 nos. ; Hydro Testing: On completion, item to be hydrostatic test on tube side

    @ 5 bar.

    Our COST Price USD$18,500.00

    Delivery Time: 12-14 days upon confirmation.

    Delivery Term: Ex-Work Shanghai

    Delivery Time: Approx. 10-12 days upon confirmation. Delivery Term: Ex-Work Shanghai

     Validity: 7 days from quoted.

    Payment Terms: 50% upon order confirmation, balance 50% upon order delivery.

Fabrication & Supply of Air con Condenser including shell and covers;10m2

    Hot Rolled Naval Brass/SS316L Tube sheets OD164mm x 16mmThk x 02no.

    Alu-Brass Tubes:OD16mm x 1.5 x 1207mmL x 32pcs Shell:OD168 x 6mmthk x 1175mmL x 1pc

    Q235-Flange:OD120 x 16mmthk x 2pcs

    Cover:OD168 x 4mmthk x 50mmL x 2pcs

Our Price for the complete unit S$

    Delivery Time 10 - 12 days upon confirmation Delivery Term: Ex-Work Shanghai