     FORM H APPOINTMENT OF A PRINICPAL CONTRACTOR FOR

    “CONSTRUCTION WORK

Developer / Client’s Details

    Name of Developer / Client:

    Address:

Head Office within Abu Dhabi Emirate:

    E-mail Address: Telephone No.:

    Fax No.: P.O. Box: Registration Number:

    Classification Code:

    Authorized Contact Person:

    Authorized Contact Person Position:

    Telephone No.: E-mail Address: Address of Authorized Person: Fax No. : P.O. Box :

Development / Project Details

     Project Name:

    Project Address:

    Coordinates: Northing: Easting: Location Map (Required): Location Map(s) of Development / Project Attached. Brief Description of Project:

     Residential / Housing Power, Water, Sewerage,

     Commercial Buildings Telecommunications, other Infrastructure

    Primary Construction Type: Demolition / Disassembly Works Industrial / Heavy Engineering

     Other:___________________________ Road, Bridge and Tunnel

    Proposed Project Duration: Start Date: / / Finish Date: / /

Version 2.0 Page 1 of 4

     FORM H APPOINTMENT OF A PRINICPAL CONTRACTOR FOR

    “CONSTRUCTION WORK

Principal Contractor Details

    Name of Principal Contractor:

    Registration Number:

    Classification Code:

    Grade:

    Address:

Head Office within Abu Dhabi Emirate: E-mail Address: Telephone No.:

    Fax No.: P.O. Box: Authorized Contact Person:

    Authorized Contact Person Position:

    Telephone No.: E-mail Address: Address of Authorized Person: Fax No. : P.O. Box :

Declaration of Developer / Client

    I declare that all information provided in this document is true, correct and complete.

Signature of the Official Authorized Stamp : Contact Person:

    Date : _____/_____/_____

Declaration of Principal Contractor

    I declare that all information provided in this document is true, correct and complete.

Signature of the Official Authorized Stamp : Contact Person:

    Date : _____/_____/_____

Version 2.0 Page 2 of 4

     FORM H APPOINTMENT OF A PRINICPAL CONTRACTOR FOR

    “CONSTRUCTION WORK

    Official Use

    EHS CMP ; Attached

     Approval of EHS - CMP:

    ; ;Reviewed and Approved;

    ; ;Not Approved, reasons / amendments required:;

    _________________________________________________________________________________________

    _________________________________________________________________________________________

    _________________________________________________________________________________________ ;

    EHS - Demolition / Decommission Plan (if required) ; Attached Approval of EHS - Demolition / Decommission Plan:

    ; ;Reviewed and Approved;

    ; ;Not Approved, reasons / amendments required:;

    _________________________________________________________________________________________

    _________________________________________________________________________________________

    _________________________________________________________________________________________ ;

Building and Construction Entered into Database by: Regulatory Authority Stamp

    Name:

    Signature:

    Date: _____ / _____ / _____

     Reviewed by:

    Name:

    Signature:

    Date: _____ / _____ / _____

Version 2.0 Page 3 of 4

     FORM H APPOINTMENT OF A PRINICPAL CONTRACTOR FOR

    “CONSTRUCTION WORK

    Instructions for Completing this Form:

    Who must initiate this process? Why must this form be submitted? This form is to be submitted to the Building and Lodgment of this form advises the AD EHSMS

    Competent Authority and the Building and Construction SRA by the Developer / Client of all

    Construction Sector Regulatory of: projects that include:

    ; the location and types of high risk ; “Construction Work” with a duration of 30 construction projects;

    days or more, or ; project timeframes and duration;

    ; “Construction Work” with a duration of less ; who the developer / client of the workplace;

    and than 30 days and the Building and

    Construction SRA understands that the ; who is in control of the workplace the

    principal contractor. project involves sufficient hazards and risks

    to require the appointment of a principal

    contractor.

    This form must be completed and approved

    before “Construction Work” is to begin on site.

    What type of construction work requires a Who must be given this form? Principal Contractor?

    Under AD EHSMS RF Element 4 Management Construction Work includes:

    of Contractors, the Developer / Client must (a) work to erect, construct, extend, alter, ensure this form is completed and is submitted to convert, fit-out, commission, renovate, the AD EHSMS Building and Construction Sector repair, refurbish, disassemble, demolish Regulatory Authority before construction work and/or decommission a structure / building / commences. services infrastructure, or part of a structure / building / services infrastructure; or

    The assigned Principal Contractors must be (b) work connected with site preparation, given a copy of the complete form before earthworks, land reclamation, excavation, “Construction Work” is to begin on site. piling, provision of services infrastructure or

    landscaping for works mentioned in

    paragraph (a); or Who must complete this form? (c) the assembly or installation of prefabricated

    components to form a structure / building / The Developer / Client must ensure this form is

    services infrastructure, or part of a structure completed and is submitted to the AD EHSMS

    / building / services infrastructure for work Building and Construction Sector Regulatory

    mentioned in paragraph (a); or Authority

    (d) the disassembly of prefabricated

    components for work mentioned in

    paragraph (a) that, immediately before the

    disassembly, formed a structure / building /

    services infrastructure or part of a structure /

    building / services infrastructure; and

    (e) Construction Work is deemed complete

    when control, operation and possession of

    the workplace is officially returned to the

    developer / client through the contractual

    arrangement process.

Version 2.0 Page 4 of 4