Variances Requested

By Joyce Russell,2014-06-28 19:50
34 views 0
Variances Requested ...

Published: October 24, 2008

    Variances Requested - Construction

Part number and rule number from which variance is requested

    Part 12 Scaffolds & Scaffold Platforms: R408.41221, Rule 1221 Summary of employer's request for variance

    To allow employer use stilts at a maximum height of 24 inches under controlled conditions and

    according to certain stipulations.

    Name of employer Location for which variance is requested

    B.R.D. Inc. Oakwood Rd., Brandon Twp.

    Brinker Team Construction Co. Fort Shelby Hotel, Detroit

Part number and rule number from which variance is requested

    Part 13 Mobile Equipment: 1926.602, Rule 1926.1000 Summary of employer's request for variance

    To allow employer to operate mobile equipment without the Roll Over Protection System (ROPS)

    provided stipulations are adhered to.

    Name of employer Location for which variance is requested

    Homrich Inc. University of Michigan, Stockwell Hall Renovations

    Stenco Constructon Co., LLC University of Michigan, Stockwell Hall Renovations

Part number and rule number from which variance is requested

    Part 32 Aerial Work Platforms: R408.43205, Rule 3205.1 (a) Summary of employer's request for variance

    To allow employer to operate an vehicle mounted elevating and rotating aerial device without an

    operators manual.

    Name of employer Location for which variance is requested

    Walter Toebe Construction Co. Gateway Project, Detroit

Part number and rule number from which variance is requested

    Part 32 Aerial Work Platforms: R408.43216, Rule 3216 (21) Summary of employer's request for variance

    To allow employer to operate an aerial work platform from the deck of a floating vessel provided

    certain stipulations are adhered to.

    Name of employer Location for which variance is requested

    Milbocker & Sons, Inc. Meridian road over the Tittabawassee River, Midland

Part number and rule number from which variance is requested

    Part 32 Aerial Work Platforms: R408.43216, Rule 3216 (6); Rule 3216 (7) Summary of employer's request for variance

    To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform, provided certain stipulations are adhered to.

    Name of employer Location for which variance is requested

    Barton Malow Company William Beaumont Hospital, Sterling Heights

    R. L. Bondy William Beaumont Hospital, Sterling Heights

    Brinker Team Construction Co. Mott Hospital, Ann Arbor

    Ferndale Electric William Beaumont Hospital, Troy

    John E. Green Co. University of Michigan Mott Childrens & Womens Hospital,

    Ann Arbor

    John E. Green Co. Troy Beaumont Hospital, Sterling Heights

    John E. Green Co. Hemlock Semiconductor Plant, Hemlock

    Oldcastle Glass Gerald R. Ford Airport, Grand Rapids

    SCI/Steelcon Grand Rapids Airport Project, Grand Rapids

    SCI/Steelcon Grand Rapids Airport Project, Grand Rapids

    Valley Painting, Inc. Gerald R. Ford Airport, Grand Rapids

    Western Mechanical Contr., Inc. William Beaumont Hospital EC/CCT, Sterling Heights

Published: July 31, 2008

    Variances Requested - Construction

Part number and rule number from which variance is requested

    Part I General Rules: R408.40115, Rule 115 (4) & (5) and

    Part II Fixed and Portable Ladders: R408.41113, Rule 1113 (5) (6) (8) & (14), and

     R408.41115, Rule 1115 (8)

    Summary of employer's request for variance

    To allow employee to paint steel lattice and pole towers ranging from 120 kV to 345 kV in the International Transmission Company territory located in Southeastern Michigan. The work would commence immediately following the variance approvals and continue until the end of the 2008 painting season.

    Name of employer Location for which variance is requested

    Morris Painting, Inc. Various Locations in the

     International Transmission Company territory located in

     The Flint & Saginaw area

Part number and rule number from which variance is requested

    Part 10 Lifting and Digging Equipment: R408.41021, Rule 1021 (a) Summary of employer's request for variance

    To allow employer to rig certain loads to the load line of the crane above the overhaul weight in accordance with certain stipulations.

    Name of employer Location for which variance is requested

    W. J. O’Neil Company BASF, Wyandotte

Part number and rule number from which variance is requested

    Part 12 Scaffolds & Scaffold Platforms: R408.41212, Rule 1212 (5) & Rule 1212 (6)

    Summary of employer's request for variance

    To allow employer to erect a scaffold closer to 110/220 volt insulated service conductors than the clearances prescribed, provided certain stipulations are adhered to.

    Name of employer Location for which variance is requested

    Davenport Masonry, Inc. Zaragon Place, Ann Arbor

Part number and rule number from which variance is requested

    Part 12 Scaffolds & Scaffold Platforms: R408.41221, Rule 1221 Summary of employer's request for variance

    To allow employer firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided certain stipulations are adhered to. Name of employer Location for which variance is requested

    B. R. D. Inc. Oakland Technological Schools SW Campus, Wixom

    B. R. D. Inc. Oakland Technological Schools NW Campus, Clarkston

    Barton Malow Co. William Beaumont Hospital, Sterling Heights

Part number and rule number from which variance is requested

    Part 12 Scaffolds & Scaffold Platforms: R408.41221, Rule 1221 Summary of employer's request for variance

    To allow employer use stilts at a maximum height of 24 inches under controlled conditions and

    according to certain stipulations.

    Name of employer Location for which variance is requested

    Barton Malow Co. William Beaumont Hospital, Sterling Heights

Part number and rule number from which variance is requested

    Part 13 Mobile Equipment: 1926.602, Rule 1926.1000 Summary of employer's request for variance

    To allow employer to operate mobile equipment without the Roll Over Protection System (ROPS)

    provided stipulations are adhered to.

    Name of employer Location for which variance is requested

    Kent Companies, Inc. Waterhouse Apartments, Grand Rapids

Part number and rule number from which variance is requested

    Part 32 Aerial Work Platforms: R408.43216, Rule 3216 (6); Rule 3216 (7) Summary of employer's request for variance

    To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform, provided certain stipulations are adhered to.

    Name of employer Location for which variance is requested

    American Erectors, Inc. United States Postal Service, Pontiac

    J. B. Cain Co. St. John Hospital, Detroit

    Eugenio Painting Co. GM Powertrain Engineering Consolidation Project, Pontiac

John E. Green Co. William Beaumont Hospital, Sterling Heights

    Great Lakes Steel United States Postal Service, Pontiac

    International Industrial Contr. Corp. GM Powertrain Engineering Consolidation Project, Pontiac

    Limbach Co. LLC Eye Center Expansion and Diabetes, Ann Arbor

    W. J. O’Neil Company BASF, Wyandotte

    Pipe Systems, Inc. University of MI Eye Center Expansion, Ann Arbor

    Sky Electric of Northern MI Bellaire High/Middle School, Bellaire

    Ventilation Systems, Inc. St. John Hospital, Detroit

    Ventcon William Beaumont Hospital, Troy

    Walbridge Aldinger United States Postal Service, Pontiac

Part number and rule number from which variance is requested

    Part 32 Aerial Work Platforms: R408.43216, Rule 3216 (21) Summary of employer's request for variance

    To allow employer to operate an aerial work platform from the deck of a floating vessel provided

    certain stipulations are adhered to.

    Name of employer Location for which variance is requested

    Davis Construction Co. M-20 over the Tittabawassee River, Midland

Published: February 29, 2008

    Variances Requested - Construction

Part number and rule number from which variance is requested

    Part 10 Lifting and Digging Equipment: R408.41021, Rule 1021 (a) Summary of employer's request for variance

    To allow the employer to rig certain loads to the load line of a crane above the overhaul weight in accordance with certain stipulations.

    Name of employer Location for which variance is requested

    Wm. Crook Fire Protection Co. Chrysler Trenton Plant, Trenton

    W. J. O’Neil Company Chrysler Trenton Plant, Trenton

Part number and rule number from which variance is requested

    Part 12 Scaffolds & Scaffold Platforms: R408.41221, Rule 1221 Summary of employer's request for variance

    To allow employer to use stilts, at a maximum height of 24 inches, under controlled conditions and

    according to certain stipulations.

    Name of employer Location for which variance is requested

    Barton Malow Company St. John Hospital, Detroit

    Rajala & Sons Finishes University of Michigan, Flint

Part number and rule number from which variance is requested

    Part 32 Aerial Work Platforms: R408.43209, Rule 3209 (8) (b), and Rule 3209 (9) Summary of employer's request for variance

    To allow employer to firmly secure scaffold planks to the top of the intermediate rail of the

    guardrail system for use as a work platform, in areas where a self-propelled elevating work platform cannot reach due to mechanical obstruction, provided certain stipulations are adhered to. Name of employer Location for which variance is requested

    Barton Malow Company St. John Hospital, Detroit

    Boone & Darr Mechanical General Motors Powertrain Lab Consolidation, Pontiac

    Buist Electric 133 E. Michigan Ave., Paw Paw

    Michigan Metal Walls, Inc. GM Powertrain Engineering Consolidation Project, Pontiac Pontiac Ceiling & Partition Co. Henry Ford Hospital, West Bloomfield

    Roncelli, Inc. General Motors Powertrain Lab Consolidation, Pontiac

Published: November 27, 2007

    Variances Requested: Construction

Part number and rule number from which variance is requested

    Part 18 Fire Prevention & Protection: R408.41851, Rule 1851 (2)

    Summary of employer's request for variance

    To allow the employer to work in the parking structure without the availability of a fire extinguisher for every 3000 sq. ft., provided certain stipulations are adhered to. Name of employer Location for which variance is requested

    Jenkins Skanska Greektown Casino, Detroit

Part number and rule number from which variance is requested

    Part 32 Aerial Work Platforms: R408.43209, Rule 3209 (8), Rule 3209 (8) (b), and Rule 3209

    (9)

    Summary of employer's request for variance

    To allow employer to firmly secure scaffold planks to the top of the intermediate rail of the guardrail system for use as a work platform, in areas where a self-propelled elevated work platform cannot reach due to mechanical obstruction, provided certain stipulations are adhered to. Name of employer Location for which variance is requested

    Applegate Inc. Hard Tech Bldg., Mason

    Coritech Services GM Powertrain Engineering Consolidation Project, Pontiac

    Hoyt, Brumm & Link, Inc. General Motors Power Train Facility, Pontiac

    MI Mechanical Insulation, Inc. General Motors Powertrain Lab Consolidation, Pontiac Shambaugh & Son L. P. General Motors Powertrain Lab Consolidation, Pontiac

Part number and rule number from which variance is requested

    Part 32 Aerial Work Platforms: R408.43209, Rule 3209 (29)

    Summary of employer's request for variance

    To allow employer to operate an aerial work platform from the deck of a floating vessel, provided certain stipulations are adhered to.

    Name of employer Location for which variance is requested thAnlaan Corporation 7 Street over Black River, Port Huron

    Milbocker & Sons, Inc. Hagadorn Bridge, East Lansing