Published: October 24, 2008

    Variances Granted - Construction

Part number and rule number from which variance is requested

    Part I General Rules: R408.40115, Rule 115 (4) & (5) and

    Part II Fixed and Portable Ladders: R408.41113, Rule 1113 (5) (6) (8) & (14), and

     R408.41115, Rule 1115 (8)

    Summary of employer's request for variance

    To allow employee to paint steel lattice and pole towers ranging from 120 kV to 345 kV in the

    International Transmission Company territory located in Southeastern Michigan. The work would

    commence immediately following the variance approvals and continue until the end of the 2008

    painting season.

    Name of employer Location for which variance is requested

    Morris Painting, Inc. Various Locations in the

     International Transmission Company territory located in

     The Flint & Saginaw area

Part number and rule number from which variance is requested

    Part 10 Lifting and Digging Equipment: R408.41021, Rule 1021 (a) Summary of employer's request for variance

    To allow employer to rig certain loads to the load line of the crane above the overhaul weight in

    accordance with certain stipulations.

    Name of employer Location for which variance is requested

    W. J. O’Neil Company BASF, Wyandotte

Part number and rule number from which variance is requested

    Part 12 Scaffolds & Scaffold Platforms: R408.41212, Rule 1212 (5) & Rule 1212 (6) Summary of employer's request for variance

    To allow employer to erect a scaffold closer to 110/220 volt insulated service conductors than the

    clearances prescribed, provided certain stipulations are adhered to.

    Name of employer Location for which variance is requested

    Davenport Masonry, Inc. Zaragon Place, Ann Arbor

Part number and rule number from which variance is requested

    Part 12 Scaffolds & Scaffold Platforms: R408.41221, Rule 1221 Summary of employer's request for variance

    To allow employer use stilts at a maximum height of 24 inches under controlled conditions and

    according to certain stipulations.

    Name of employer Location for which variance is requested

    Barton Malow Co. William Beaumont Hospital, Sterling Heights

Part number and rule number from which variance is requested

    Part 32 Aerial Work Platforms: R408.43216, Rule 3216 (6); Rule 3216 (7) Summary of employer's request for variance

    To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system

    of a self-propelled elevating work platform, provided certain stipulations are adhered to.

    Name of employer Location for which variance is requested

    J. B. Cain Co. St. John Hospital, Detroit

    W. J. O’Neil Company BASF, Wyandotte

    Pipe Systems, Inc. University of MI Eye Center Expansion, Ann Arbor

    Ventcon William Beaumont Hospital, Troy

    Ventilation Systems, Inc. St. John Hospital, Detroit

Published: July 31, 2008

    Variances Granted - Construction

Part number and rule number from which variance is requested

    Part 10 Lifting and Digging Equipment: R408.41021, Rule 1021 (a) Summary of employer's request for variance

    To allow employer to rig certain loads to the load line of a crane above the overhaul weight in

    accordance with certain stipulations.

    Name of employer Location for which variance is requested

    W. J. O’Neil Company Chrysler Trenton Plant, Trenton

Part number and rule number from which variance is requested

    Part 12 Scaffolds & Scaffold Platforms: R408.41221, Rule 1221 Summary of employer's request for variance

    To allow employer to use stilts at a maximum height of 24 inches, under controlled conditions, and

    according to certain stipulations.

    Name of employer Location for which variance is requested

    Barton Malow Company St. John Hospital, Detroit

    Rajala & Sons Finishes University of Michigan, Flint

Part number and rule number from which variance is requested

    Part 32 Aerial Work Platforms: R408.43216, Rule 3216 (6) and Rule 3216 (7) Summary of employer's request for variance

    To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system

    of a self-propelled aerial lift for use as a work platform, in areas where a self-propelled elevating

    work platform cannot reach due to mechanical obstruction, provided certain stipulations are

    adhered to.

    Name of employer Location for which variance is requested

    Barton Malow Company St. John Hospital, Detroit

    Michigan Metal Walls, Inc. GM Powertrain Engineering Consolidation Project, Pontiac

    Pontiac Ceiling & Partition Co. LLC Henry Ford Hospital, West Bloomfield

Published: February 29, 2008

    Variances Granted - Construction

Part number and rule number from which variance is requested

    Part 32 Aerial Work Platforms: R408.43209, Rule 3209 (8) (b), and Rule 3209 (9) Summary of employer's request for variance

    To allow employer to firmly secure scaffold planks to the top of the intermediate rail of the

    guardrail system for use as a work platform, in areas where a self-propelled elevating work

    platform cannot reach due to mechanical obstruction, provided certain stipulations are adhered to.

    Name of employer Location for which variance is requested

    Michigan Mechanical Insulation General Motors Powertrain Lab Consolidation, Pontiac

    Hoyt, Brumm, & Link, Inc. General Motors Power Train Facility, Pontiac

    Shambaugh & Son L.P. General Motors Powertrain Lab Consolidation, Pontiac

Part number and rule number from which variance is requested

    Part 32 Aerial Work Platforms: R408.43209, Rule 3209 (29) Summary of employer's request for variance

    To allow employer to operate an aerial work platform from the deck of a floating vessel, provided

    certain stipulations are adhered to.

    Name of employer Location for which variance is requested thAnlaan Corporation 7 Street over Black River, Port Huron

Published: November 27, 2007

    Variances Granted: Construction

Part number and rule number from which variance is requested

    Part 1 General Rules: R408.40115, Rule 115 (4) & (5) and Part 11 Fixed & Portable Ladders: R408.41113, Rule 1113 (5) (6) (8) & (14) Summary of employer's request for variance

    To allow employee to paint steel lattice and pole towers ranging from 120 kV to 345 kV in the

    International Transmission Company territory located in Southeastern Michigan. The work would

    commence immediately following the variance approvals and continue until the end of the 2007

    painting season.

    Name of employer Location for which variance is requested

    Morris Painting, Inc. Various Locations in the International Transmission

    Company territory located in Southeastern Michigan

Part number and rule number from which variance is requested

    Part 10 Lifting and Digging Equipment: R408.41025, Rule 1025a (12) Summary of employer's request for variance

To allow employer to make Multi-Lifts of up to four bundles of re-steel at one time, provided

    certain stipulations are adhered to.

    Name of employer Location for which variance is requested

    Colasanti Specialty Services, Inc. Greektown Expansion Project

Part number and rule number from which variance is requested

    Part 32 Aerial Work Platforms: R408.43209, Rule 3209, Rule 3209 (8) (b), Rule 3209 (8) (c),

    and Rule 3209 (9)

    Summary of employer's request for variance

    To allow employer to firmly secure scaffold planks to the top of the intermediate rail of the

    guardrail system for use as a work platform, in areas where a self-propelled elevated work

    platform cannot reach due to mechanical obstruction, provided certain stipulations are adhered to.

    Name of employer Location for which variance is requested

    Allied Ventilation, Inc General Motors Powertrain Lab Consolidation,

    Pontiac Bristol Steel & Conveyor Corp. 2010 MY Phoenix Engine Program

    Chrysler-Trenton Plant, Trenton Conti Electric GM Powertrain Engineering Consolidation Project,

    Pontiac De-Cal Mechanical Inc. GM Powertrain Engineering Consolidation Project,

    Pontiac Denn-Co Construction, Inc. GM Powertrain One Lab, Pontiac

    Denn-Co Construction, Inc. J P Morgan Chase Data Center, Belleville

    Dependent Insulation Company, Inc. St. John Hospital, Detroit

    Pace Mechanical Services, Inc. General Motors Powertrain Lab Consolidation,

    Pontiac Pontiac Ceiling & Partition Co. LLC United States Postal Service NE Metro P&DC,

    Pontiac

Part number and rule number from which variance is requested

    Part 32 Aerial Work Platforms: R408.43209, Rule 3209 (29)

    Summary of employer's request for variance

    To allow employer to operate an aerial work platform from the deck of a floating vessel provided

    certain stipulations are adhered to.

    Name of employer Location for which variance is requested

    Milbocker & Sons, Inc. Lincoln Bridge over the Cheboygan River,

    Cheboygan