Test Scenario No. : MPB002

    SCENARIO: BTO: Domestic Direct Sales, OWNER: BUSINESS CASE: Sales to DongGuan Nokia STATUS: DESCRIPTION: PO;Sales Order;MRP;Purchase;DV; Run MPS;Production;Create Sales Order ;Create RUN NO.:

    Delivery ;Create Shipment;Post Goods Issue;Billing;A/P & A/R operation

    EXPECTED RESULTS: RUN DATE:

SETUP DATA

    DATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES Company code CNBF 富士康精密组件(北京)有限公司

    Plant WBB1 BF MPB Domestic PLANT

    Customer Master 6183645940 東莞諾基亞移動電話有限公司

    Material Master 0201677 Beetle N3310

    Sales Org. WLB1 MPB FuTaiHong

    Distribution Channel D0 Domestic Sales

    Division MP Mobile Products

TRANSACTIONAL STEPS

    TRANS. INPUT DATA / SPECIAL OUTPUT DATA / TESTER / No. BUSINESS PROCESS STEPS Remark CODE INFORMATION RESULT TEAM 1 1Receive Customer Forecast from customer Delivery

    and create Shipping Plan (Offline) Control 2 2Upload Shipping Plan to Inactive Planned ZPMD61 Plant: WBB1 WBB1 PIR Delivery

    Independent Requirement (PIR) in SAP Version: XX Control/PP

    Demand Management Version Active:

    Input file: file direction

    3 3Display PIR (Inactive version) at the LH plant. MD63 Plant: WBB1 Plnd ind. reqmts Display: Delivery

    SAP Easy Access: Selected versions: XX Planning Table (PIR with Control/Ma

    Logistics -> Production -> allocated weekly forecast) ster planner Production Planning -> Demand

    Management -> Planned Independent

    Requirements -> Display

    4 4Perform L ong-Term Planning (LTP) with MS01 Planning scenario: 010 Simulated MRP result: Delivery

    simulated MRP. Plant: WBB1 1. Material status Control/Ma

    SAP Easy Access: MRP control parameters 2. Capacity planning ster planner

    Logistics -> Production -> Processing key: NETCH (Net Production Planning -> Long-Term change for total horizon) Planning -> Long-Term Planning -> Create MRP list: 1 MRP list Single-Item, Multi-Level Planning mode: 3 (Delete and recreate planning data)

     1 of 8

    Scheduling: 2 (Lead time

    scheduling and capacity

    planning)

    Include firm planned orders: 1

    (Use setting in planning

    scenario)

    5 5Check simulated capacity situation to see if it CM38 Planning scenario: 010 Capacity load for WBLA Master

    exceeds the plant capacity. Work center: WBB1 (whole Planner

    SAP Easy Access: plant W/C group)

    Logistics -> Production -> Plant:WBB1 Production Planning -> Long-Term Settings/General... Planning -> Evaluations -> Hierarchy Capacity requirements -> Work ;Cumulation of reqmts centers ;Dyn. Capacity cumul. Hierarchy: WBB1

    Plant: WBB1

    6 6Check Long -Term Planning results.: material MS05/MSPlanning scenario: 010 Material status for

    status 06 simulated MRP Material: 0201677

    SAP Easy Access: Plant: WBB1 Logistics -> Production ->

    Production Planning -> Long-Term

    Planning -> Evaluations -> MRP

    list

    7 7Send forecast to vendors and post material TBD requirements of forecast (LTP) on the Foxconn

    Suppliers' web site.

    Vendors will commit requirement qty on the

    web.

    8 8Adjust PIR (Inactive version) if vendor Material: 0201677 MD62 committed qty is short (from the web) or plant Plant: WBB1

    capacity is insufficient. Version: XX

    SAP Easy Access:

    Logistics -> Production ->

    Production Planning -> Demand

    Management -> Planned Independent

    Requirements -> Change

    9 Create an active PIR by copying the satisfied Plant:WBB1 MS64 inactive PIR and assigning a valid version. Material: 0201677

    SAP Easy Access: Source version: