    List of Key Investment Projects

    1.The Project of 2×15MW Bio-Straw Power Generation

    2.Silicone Monomer Project with the Annual Production of 100,000 Tons

    3Project of Comprehensive Utilization Power Plant with a Capacity of 2×300,000KW

    4Project of 4×600,000KW Pithead Power Plant in Guotun Village

    5The Project of Producing 860,000 Tons of Urea with 500,000 Tons/Year Compound Ammonia

    61.2 Million Tons per Year Methanol to Olefins Project

    7Project of 300,000 Tons/Year Deep Processing of Coal Tar

    8Project with the Annual Production of 1 Million Tons of Dimethyl Ether

    9The Acetum Project with the Annual Production of 400,000 Tons

    10.Needle Coke Project with the Annual Production Capacity of 100,000 Tons

    11.Project of Bromo-Chloro-Dimethyl Hydantoin Industrial Bactericide

    12.Low-E Energy-Saving Composite Functional Glass Project

    13.Hollow Glass Project

    14Ion-Exchange Membrane Caustic Soda Project with the Annual Production of 300,000 Tons

    15.Geothermal Development Project in Juancheng County

    16.Organic Urea Project with the Annual Production of 200,000 Tons

    17.Lactic Acid Project

    18.The 2nd Stage of Shandong Bairui Pharmaceuticals Project

    19.Xanthan Gum Production Project with the Annual Production of 5,000 Tons

    20. All Steel Cord Truck Radial Tire Project

    21.High Pressure Common Rail System Construction Project with the Annual Production of 150,000 Sets

    22. Green Energy-Solar LED Semiconductor Lighting Project

    23.Project of Solar Photovoltaic Industry Vertical Integration with the Annual Production of 300MW

    24. 100MW Amorphous Silicon Film Solar Cell Project

    25.Project of Semiconductor Chip with Sensitive Materials

    26.High/Medium Density Fiberboard Project

    27.New Plant Fiber-Plastic Composite Materials Project with the Annual Production of 50,000 Tons

    28.The Foodstuff Manufacturing Project of the New Energy of Peony Flower

    29.Yam Processing Project with the Annual Production of 200,000 Tons

    30.Commercial Pig Breeding, Slaughtering and Packaging Project

    31.Industrialization Development Project of Apios Americana Medic

    32.Business Saint-Fan Li Cultural Park Project

    33.Wenting Lake Ecological Scenic Spot Construction Project

    34.Project of Yellow River Culture Browing Services

    35.Sun Bin Military Culture and Tourism Development Project

    36.Vehicle Fittings Market Project in Heze City

    37.Yarn-Dyed Fabric Project with the Annual Output of 22

    Million Meters

    38.Flax Cultivation and Linen Production Project

    39.Cotton Yarn & Craft Cloth Cogeneration Project

    40.Poplar Wooden Yarn Texitile Project

Return to list

    1.The Project of 2×15MW Bio-Straw Power Generation

    ?. Content

    The project will establish a 2×15MW extraction condensing steam burbine-generator unit matched with 2×75t/h biomass straw fired boiler and the corresponding production and living facilities.

    ?. Construction Condition

    Located in the Yellow River alluvial plain, Chengwu County is very suitabel for the growth and development of the crops and trees. The remainder of the straw and branches in Chengwu County are well over 500,000 tons, which can fully meet the demand for 180,000 tons/year.

    At present, the relevant supporting documents have been completed: ?.the feasibility report has been completed;?.the EIA has been

    approved by Shandong Environmental Protection Department with the approval No. of Luhuanshen[2008]301;?.the land for the project has

    been pre-examined by Shandong Land Resources Department with the pre-examined No. of Luguotuzizi[2008]222; ?.Chengwu Urban and

    Rural Construction Bureau has issued a Construction Site Selection Paper with the No. of Urban Construction [08] No.001; ?. Shandong Electric

    Power Group Corporation has approved the power access system program with the No. of Lu Electric Group’s Development [2008]574.

    ?. Investment Estimate and Economic Benefit Analysis

    The total investment capital of the project will be 283.2525

    million Yuan including the fixed assets of 281.2297 million Yuan and

    the circulation fund of 2.0228 million Yuan.

    After the project has been put into production, the annual operating hours will be 8,000 hours and the annual energy output will be 180.48 million KWH. The sales income will reach 122.14 million Yuan and

    the profit & tax will be 53.19 million Yuan including the profit of

    33.87 million Yuan.

    ?. Market Analysis

    The biomass power generation project with the fuel materials of the

    crop straws is a kind of clean energy project encouraged and supported by the state. In February 2006, the National Development and Reform Commission promulgated a rule named Renewable Energy Prices and the Cost-Sharing Management Pilot Scheme” to carry out the special preferential policies for the biomass power generation including the straw biomass power generation. Based on the price of the desulphurization coal-fired units in 2005, 0.25 Yuan/KWH will be subsidized for the

    biomass power generation project. This part of the cost will be shared by the provincial level and the above. Meanwhile, the Network on renewable energy and the access system will be established and managed by the grid enterprises.

    ?. Cooperation Mode

    Solely, holding, etc.

    ?. Contact Mode

    Contact Person: Mr. Hu Futian 13184092897

     Mr. Zhang Yongjun

    Tel: +86-530-8685789

    Fax: +86-530-8638038

    E-mail: cwxmb038@163.com

    Website: www.chengwu.gov.cn

    Return to list

    2.Silicone Monomer Project with the Annual Production of 100,000 Tons

    ?. Name

    Silicone monomer project with the annual production of 100,000 tons.

    ?. Brief Introduction to the Unit

    Lying in the middle part of Gucheng Street of Juye County,

    Juye Lulin Lin Mine Co., Ltd. has the staff member of 1,250, including the middle and senior technical staff member of 45. With the registered capital of 200 million, Juye Lulin Lin Mine Co., Ltd. mainly deals with wholesale and retail construction materials, electromechanical products, knitted apparel and appliances for labor protection, real estate operation and nonmetal development. In 2003, Juye Lulin Line Mine Co., Ltd. and Xinwen Coal Mine Group registered and established Shandong Xinjulong Energy Co., Ltd.. Juye Lulin Lin Mine Co., Ltd. covers the stock of 10% with the investment capital of 100 million. The designed

    annual production capacity of the project is 6 million tons.

    ?. Content and Construction Scale

    The project will establish a set of silicone monomer production equipment with the annual production capacity of 100,000 tons, matching with methyl chloride synthesizer and silicon treatment device.

    ?. Construction Conditions

    Relying on the products, such as methanol and so on, supplying advantage in Juye Coal Chemical Industry Zone, adopting the advanced developing technoly in domestic market, the project will establish a set of silicone monomer equipment with the annual production capacity of 100,000 tons. Meanwhile, it will keep on developing the organic silicone material such as silicone rubber, silicone oil and so on in order to promote the local economy.

    The project has got the provincial approval with the registration record No. of 0900000009. The EIA has been approved by Shandong

    Environmental Protection Department with the approval symbol of Luhuanshen [2009]153. It is expected to start the construction work in 2011 and complete in 2012.

    The project is planned to be established in the Juye Coal Chemical Industry Park. The approval of the environmental evaluation of the sewage treatment plant and the slag yard from the concerning departments has made a good platform for the development of the project. The main raw materials of the project are silicon block, methanol, hydrogen chloride and so on. It is very convenient to buy the silicon block and hydrogen chloride. The methanol can be supplied by the methanol production device planned to be established within the industry park.

    ?. Total Investment Capital and Capital Source

    The total investment capital of the project will be 767.62 million

    including the self-prepare capital of 214.92 million and the financing

    capital of 552.7 million.

    ?. Market & Benefit Analysis and Forecast

    Silicon is a kind of new hi-tech material which is widely used in the fields of electronic, electrical, aviation, aerospace, construction, textile, medicine, daily chemical and so on. The domestic demand for silicon monomer will increase at the annual average rate of 12-15% during 2010-2015. The domestic demand for silicon monomer will be 1.75-2 million tons in 2015.

    ?. Cooperation Mode

    Solely, cooperation, joint venture

    ?. Contact Way

    Contact Person: Mr. Yao Baoge +86-13853002998

     Mr. Song Chuanguo +86-15315402818

    Tel: +86-530-6130202 Fax: +86-530-6130101

    E-mail: zhaoshang2005@163.com

    Postal Code: 274900 Return to list

    3Project of Comprehensive Utilization Power Plant with a Capacity of 2×300,000KW

    ?. Name

    Project of Comprehensive Utilization Power Plant with a Capacity of 2×300,000KW in Zhaolou Town

    ?. Brief Introduction to the Unit

    In order to comprehensively develop the mining area in Juye County, Yanzhou Mining (Heze) Energy Co., Ltd was established by Yanzhou Mining Group in Oct. 2002. In the year of 2004, Yanzhou Mining Group and Heze Municipal Government signed the agreement saying Yanzhou Mining (Heze) Energy Co., Ltd be in charge of developing the 2 mines in Zhaolou Town and Wanfu Town with the annual production scale of 4.8 million tons. The project will establish a coal separating plant with the same scale as the 2 mines in Zhaolou Town and Wanfu Town, a power plant with low calorific fuel matched with the above 2 mines, special railway line and so on.

    ?. Content and Construction Planning

    The construction unit of this project is circulating fluidized bed, 300MW unit, public utilities and other engineering services. The programmed installation capacity is 2 × 3 million kilowatt. On the 1st stage, the installation capacity will be 1× 300,000kw. This project reserved for the expansion of land. The project covers the area of 220 mu (1 mu equals to 666.7 m2).

    ?. Construction Conditions

    Yuncheng County has abundant coal resource. The coal mine in Zhaolou Town can produce washed coal, slime, gangue and other low calorific fuel and natural coke. Therefore, the raw material supply can be guaranteed.

    ?. Total Investment Capital

    The total investment of the project will be $470 million including the fixed assets of $450 million and the circulating funds of $20 million.

    ?. Market & Benefit Analysis and Forecast

    After the project has been put into production, the annual generated

    energy will be 3.2 billion kwh. The sale income will be 1.26 billion

    Yuan and the profit & tax will be 256 million Yuan. The payback period will be 10 years.

    ?. Cooperation Mode

    Joint venture, stock participation, cooperation.

    ?. Contact Mode

    Contact Person: Mr. Ding Xiaosheng

    Contact Mode: +86-530-6157701

    Mobile phone No.: 13854075558

    Return to list

    4Project of 4×600,000KW Pithead Power Plant in Guotun Village

    ?. Name

    Project of 4×600,000KW Pithead Power Plant in Guotun Village

    ?. Brief Introduction to the Unit

    Shandong Luneng Heze Coal Development Co., Ltd. is registered by Shandong Luneng Group in Heze. The company has 2 coal mines in Pengzhuang Village and Guotun Village of Yuncheng County. Luneng Group is a large state-owned enterprise, mainly dealing with coal, mining, real estate, transport and logistics. Since the company established, it has paid the tax about 16 billion Yuan totally. It ranked No. 67 on the tax list of the domestic enterprises in 2007.

    ?. Content and Construction Scale

    The scale of the project has been programmed to be 4×600,000 KW. The project will be established by 2 stages. In the 1st stage, the project will establish a 2×600,000 KW supercritical coal-fired generating units made in China. Meanwhile, it will establish some flue gas

    desulphurization facilities. There will be plenty room for expansion for the 2nd stage.

    ?. Construction Conditions

    Taking the advantage of the abundant local coal resources, the project can provide a strong power for Shandong Network and meet the growing demand for electricity across the province. The project will try to alleviate the transport pressure, save transportation cost, maximize the overall advantages and improve the economic efficiency of the enterprises and social benefit. The project has been included in the power development plan of the “Eleventh Five-Year” of Shandong Province.

    ?. Total Investment Capital

    The total investment capital of the project will be 9.06 billion

    Yuan including the fixed assets of 8.7 billion Yuan and the circulating

    funds of 90 million Yuan.