    PROJECT DESIGN DOCUMENT FORM

    FOR AFFORESTATION AND REFORESTATION PROJECT ACTIVITIES (CDM-AR-PDD) - Version 04

    CLEAN DEVELOPMENT MECHANISM

    PROJECT DESIGN DOCUMENT FORM FOR AFFORESTATION AND REFORESTATION

    PROJECT ACTIVITIES (CDM-AR-PDD) Version 04

    CONTENTS

     A. General description of the proposed A/R CDM project activity

     B. Duration of the project activity / crediting period

     C. Application of an approved baseline and monitoring methodology

     D. Estimation of ex ante net anthropogenic GHG removals by sinks and estimated amount of net anthropogenic GHG removals by sinks over the chosen crediting period

     E. Monitoring plan

    F. Environmental impacts of the proposed A/R CDM project activity

    G. Socio-economic impacts of the proposed A/R CDM project activity

     H. Stakeholders’ comments

    Annexes

     Annex 1: Contact information on participants in the proposed A/R CDM project activity

     Annex 2: Information regarding public funding

     Annex 3: Baseline information

    Annex 4: Monitoring plan

    1/13

    UNFCCC/CCNUCC

CDM Executive Board

    PROJECT DESIGN DOCUMENT FORM

    FOR AFFORESTATION AND REFORESTATION PROJECT ACTIVITIES (CDM-AR-PDD) - Version 04

    SECTION A. General description of the proposed A/R CDM project activity:

A.1. Title of the proposed A/R CDM project activity:

    >>

A.2. Description of the proposed A/R CDM project activity:

    >>

A.3. Project participants:

    >>

    Please list project participants and Party(ies) involved and provide contact information in Annex 1.

    Information shall be indicated using the following tabular format.

    Indicate if the Party Private and/or public entity(ies) Name of Party involved (*) involved wishes to be project participants (*) ((host) indicates a host Party) considered as a project (as applicable) participant (Yes/No)

    ? Private entity A Name A (host) No ? Public entity A …

    Name B Yes ? None

    Name C No ? None

     ?

    (*) In accordance with the CDM A/R modalities and procedures, at the time of making the CDM-AR-

    PDD public at the stage of validation, a Party involved may or may not have provided its approval. At

    the time of requesting registration, the approval by the Party(ies) involved is required.

    Note: When the CDM-AR-PDD is prepared to support a proposed new baseline and monitoring

    methodology (form CDM-AR-NM), at least the host Party(ies) and any known project participant (e.g.

    those proposing a new methodology) shall be identified.

    A.4. Description of location and boundaries of the A/R CDM project activity:

     A.4.1. Location of the proposed A/R CDM project activity:

     A.4.1.1. Host Party(ies):

    >>

     A.4.1.2. Region/State/Province etc.:

    >>

     A.4.1.3. City/Town/Community etc:

    2/13

    UNFCCC/CCNUCC

CDM Executive Board

    PROJECT DESIGN DOCUMENT FORM

    FOR AFFORESTATION AND REFORESTATION PROJECT ACTIVITIES (CDM-AR-PDD) - Version 04

>>

     A.4.2 Detailed geographic delineation of the project boundary, including information allowing the unique identification(s) of the proposed A/R CDM project activity: >>

A.5. Technical description of the A/R CDM project activity:

     A.5.1. Description of the present environmental conditions of the area planned for the

    proposed A/R CDM project activity, including a concise description of climate, hydrology, soils,

    ecosystems (including land use):

    >>

     A.5.2. Description of the presence, if any, of rare or endangered species and their habitats:

    >>

     A.5.3. Species and varieties selected for the proposed A/R CDM project activity: >>

     A.5.4. Technology to be employed by the proposed A/R CDM project activity: >>

     A.5.5. Transfer of technology/know-how,if applicable: >>

     A.5.6. Proposed measures to be implemented to minimize potential leakage: >>

A.6. Description of legal title to the land, current land tenure and rights to tCERs / lCERs issued for

    the proposed A/R CDM project activity:

    >>

A.7. Assessment of the eligibility of the land:

    >>

    3/13

    UNFCCC/CCNUCC

CDM Executive Board

    PROJECT DESIGN DOCUMENT FORM

    FOR AFFORESTATION AND REFORESTATION PROJECT ACTIVITIES (CDM-AR-PDD) - Version 04

A.8. Approach for addressing non-permanence:

    >>

    A.9. Estimated amount of net anthropogenic GHG removals by sinks over the chosen crediting period:

    >>

    Summary of results obtained in Sections C.7., D.1., and D.2.

    Estimation Estimation of net Estimation of of baseline anthropogenic Estimation actual net GHG net GHG GHG removals of leakage Year removals by removals by by sinks (tonnes (tonnes of sinks (tonnes of sinks (tonnes e) of CO2 e) CO2of COCO e) e) 22

    Year A

    Year B

    Year C

    Year …

    Total

    (tonnes of

    CO2 e)

    A.10. Public funding of the proposed A/R CDM project activity: >>

    SECTION B. Duration of the project activity / crediting period

    B.1 Starting date of the proposed A/R CDM project activity and of the crediting period: >>

    B. 2. Expected operational lifetime of the proposed A/R CDM project activity: >>

B.3 Choice of crediting period:

     B.3.1. Length of the renewable crediting period (in years and months), if selected:

    >>

    4/13

    UNFCCC/CCNUCC

CDM Executive Board

    PROJECT DESIGN DOCUMENT FORM

    FOR AFFORESTATION AND REFORESTATION PROJECT ACTIVITIES (CDM-AR-PDD) - Version 04

     B.3.2. Length of the fixed crediting period (in years and months), if selected:

    >>

    SECTION C. Application of an approved baseline and monitoring methodology

    C.1. Title and reference of the approved baseline and monitoring methodology applied to the proposed A/R CDM project activity:

    >>

C.2. Assessment of the applicability of the selected approved methodology to the proposed A/R

    CDM project activity and justification of the choice of the methodology: >>

C.3. Assessment of the selected carbon pools and emission sources of the approved methodology to

    the proposed CDM project activity:

    >>

    C.4. Description of strata identified using the ex ante stratification: >>

C.5. Identification of the baseline scenario:

    >>

    C.5.1. Description of the application of the procedure to identify the most plausible baseline

    scenario (separately for each stratum defined in C.4.):

    >>

    C.5.2. Description of the identified baseline scenario (separately for each stratum defined in Section C.4.):

    >>

C.6. Assessment and demonstration of additionality:

    >>

    C.7. Estimation of the ex ante baseline net GHG removals by sinks: >>

    5/13

    UNFCCC/CCNUCC

CDM Executive Board

    PROJECT DESIGN DOCUMENT FORM

    FOR AFFORESTATION AND REFORESTATION PROJECT ACTIVITIES (CDM-AR-PDD) - Version 04

ID Data Data Value applied Data Source Comment 1number variable unit

    Please present final results of your calculations using the following tabular format.

    Year Annual estimation of baseline net

    anthropogenic GHG removals by sinks in

    tonnes of CO e 2

    Year A

    Year B

    Year C

    Year …

     Total estimated baseline net GHG

    removals by sinks (tonnes of CO2 e)

     Total number of crediting years

     Annual average over the crediting

    period of estimated baseline net

    GHG removals by sinks (tonnes of

    CO2 e)

C.8. Date of completion of the baseline study and the name of person(s)/entity(ies) determining the

    baseline:

    >>

    SECTION D. Estimation of ex ante actual net GHG removals by sinks, leakage and estimated amount of net anthropogenic GHG removals by sinks over the chosen crediting period

    D.1. Estimate of the ex ante actual net GHG removals by sinks: >>

D.2. Estimate of the ex ante leakage:

    >>

1 Please provide ID number for cross-referencing in the PDD.

    6/13

    UNFCCC/CCNUCC

    CDM Executive Board

    PROJECT DESIGN DOCUMENT FORM

    FOR AFFORESTATION AND REFORESTATION PROJECT ACTIVITIES (CDM-AR-PDD) - Version 04

SECTION E. Monitoring plan

E.1. Monitoring of the project implementation:

    >>

    E.1.1. Monitoring of forest establishment and management:

    >>

    ID Data Data Measured Recording Number of Comment 2number variable unit (m), frequency data

    calculated points /

    (c) Other

    estimated measure of

    (e) or number of 3default (d) collected

    data.

    E.1.2. If required by the selected approved methodology, describe or provide reference to, SOPs

    and quality control/quality assurance (QA/QC) procedures applied. >>

    ID Data Data Measured Recording Number of Comment 4number variable unit (m), frequency data

    calculated points /

    (c) Other

    estimated measure of

    (e) or number of 5default (d) collected

    data.

2 Please provide ID number for cross-referencing in the PDD.

    3 Please provide full reference to data source.

    4 Please provide ID number for cross-referencing in the PDD.

    5 Please provide full reference to data source.

    7/13

    UNFCCC/CCNUCC

    CDM Executive Board

    PROJECT DESIGN DOCUMENT FORM

    FOR AFFORESTATION AND REFORESTATION PROJECT ACTIVITIES (CDM-AR-PDD) - Version 04

E.2. Sampling design and stratification

    >>

    E.3. Monitoring of the baseline net GHG removals by sinks, if required by the selected approved methodology:

    >>

    ID Data Data Measured Recording Number of Comment 6number variable unit (m), frequency sample

    calculated plots at

    (c) which the

    estimated data will be

    (e) or monitored 7default (d)

    E.4. Monitoring of the actual net GHG removals by sinks: >>

     E.4.1. Data to be collected in order to monitor the verifiable changes in carbon stock in the

    carbon pools within the project boundary resulting from the proposed A/R CDM project activity:

    >>

    ID Data Data Measured Recording Number of Comment 8number variable unit (m), frequency sample

    calculated plots at

    (c) which the

    estimated data will be

    (e) or monitored 9default (d)

6 Please provide ID number for cross-referencing in the PDD.

    7 Please provide full reference to data source.

    8 Please provide ID number for cross-referencing in the PDD.

    9 Please provide full reference to data source.

    8/13

    UNFCCC/CCNUCC

    CDM Executive Board

    PROJECT DESIGN DOCUMENT FORM

    FOR AFFORESTATION AND REFORESTATION PROJECT ACTIVITIES (CDM-AR-PDD) - Version 04

     E.4.2. Data to be collected in order to monitor the GHG emissions by the sources, measured

    in units of CO equivalent, that are increased as a result of the implementation of the proposed A/R 2

    CDM project activity within the project boundary:

    >>

    ID Data Data Measured Recording Number of Comment 10number variable unit (m), frequency sample

    calculated plots at

    (c) which the

    estimated data will be

    (e) or monitored 11default (d)

E.5. Leakage:

    >>

     E.5.1. If applicable, please describe the data and information that will be collected in order to

    monitor leakage of the proposed A/R CDM project activity: >>

    ID Data Data Measured Recording Number Comment 12number variable unit (m), frequency of data

    calculated points

    (c)

    estimated

    (e) or 13default (d)

10 Please provide ID number for cross-referencing in the PDD.

    11 Please provide full reference to data source.

    12 Please provide ID number for cross-referencing in the PDD.

    13 Please provide full reference to data source.

    9/13

    UNFCCC/CCNUCC

    CDM Executive Board

    PROJECT DESIGN DOCUMENT FORM

    FOR AFFORESTATION AND REFORESTATION PROJECT ACTIVITIES (CDM-AR-PDD) - Version 04

E.5.2. Specify the procedures for the periodic review of implementation of activities and measures to

    minimize leakage, if required by the selected approved methodology:

    >>

E.6. Provide any additional quality control (QC) and quality assurance (QA) procedures undertaken

    for data monitored not included in section E.1.3:

    >>

Data Uncertainty level of data Explain QA/QC procedures planned for these data, or

    (Indicate ID (High/Medium/Low) why such procedures are not necessary. number)

E.7. Please describe the operational and management structure(s) that the project operator will

    implement in order to monitor actual GHG removals by sinks and any leakage generated by the proposed A/R CDM project activity:

    >>

E.8. Name of person(s)/entity(ies) applying the monitoring plan:

    >>

    SECTION F. Environmental impacts of the proposed A/R CDM project activity:

F.1. Documentation on the analysis of the environmental impacts, including impacts on biodiversity

    and natural ecosystems, and impacts outside the project boundary of the proposed A/R CDM project activity:

    >>

    F.2. If any negative impact is considered significant by the project participants or the host Party, a statement that project participants have undertaken an environmental impact assessment, in

    accordance with the procedures required by the host Party, including conclusions and all references

    to support documentation:

    >>

F.3. Description of planned monitoring and remedial measures to address significant impacts

    referred to in section F.2. above:

    >>

    10/13