DOC

LAB376DY

By Jonathan Wilson,2014-10-06 15:56
8 views 0
LAB376DY

    Practice - Defining Standard Operations Distribution

    Oracle Bills of Material

    *Job Title

    Ownership

    The Job Title [list@YourCompany.com?Subject=16_Practice_Standard_Operations] is

    responsible for ensuring that this document is necessary and that it reflects actual practice.

     Copyright ? Oracle Corporation, 2005. All rights reserved.

    Practice - Defining Standard Operations 85853361.DOC

    Effective 07/04/02 Page 1 of 8 Rev 1

Practice - Defining Standard Operations

    Overview

    In this practice you will define a standard operation and create an alternate routing. Assumptions

    ; Use the Manufacturing and Distribution Manager responsibility to complete this

    practice.

    ; You must have access to an Oracle Application Vision database or comparable training

    or test instance at your site on which to complete this practice. Tasks

    Defining Standard Operations

    1. Create a standard operation for the test operation called ##TE using the table below.

    Department Description UOM Basis Resource Resource Usage Assigned

    Sequence Name Rate Units

    ##Test 10 ##Tester HR Item 2 1 Test

    motherboard

Defining Alternate Routings

    2. Create an Alternate Name called ##ALT.

    3. Create an alternate routing using ##ALT for item ##2010 using the table below.

    Department Description Basis Operation Resource Resource Usage Assigned

    Sequence Sequence Name Rate Units

    ##AutoIns 100 10 ##Inserter 2 Lot 1 Machine

    install

    components

     20 ##Inserter 1 Item 1

    ##ManAssy 200 10 ##Assblr .1 Item 10 Hand install

    components

     Copyright ? Oracle Corporation, 2005. All rights reserved.

    Practice - Defining Standard Operations 85853361.DOC

    Effective 07/04/02 Page 2 of 8 Rev 1

4. Add Operation Sequence 300 to your alternate routing for item ##2010. Enter your standard

    operation ##TE for Operation Sequence 300.

     Copyright ? Oracle Corporation, 2005. All rights reserved.

    Practice - Defining Standard Operations 85853361.DOC

    Effective 07/04/02 Page 3 of 8 Rev 1

Solution Defining Standard Operations

    Defining Standard Operations

    Responsibility = Manufacturing and Distribution Manager 1. Create a standard operation for the test operation called ##TE using the table below.

    2. Navigate to the Standard Operations window.

    ; (N) Bills of Material > Routings > Standard Operations

    Department Description UOM Basis Resource Resource Usage Assigned

    Sequence Name Rate Units

    ##Test 10 ##Tester HR Item 2 1 Test

    motherboard

3. Enter the Code, Description, and Department in the Standard Operations window.

4. Select Operation Resources.

    ; (B) Operation Resources

     Copyright ? Oracle Corporation, 2005. All rights reserved.

    Practice - Defining Standard Operations 85853361.DOC

    Effective 07/04/02 Page 4 of 8 Rev 1

5. Enter Resource Sequence, Resource Name, UOM, Basis, and Usage Rate in the Resources

    window under the Main tab.

6. Enter Assigned Units under the Schedule tab.

     Copyright ? Oracle Corporation, 2005. All rights reserved.

    Practice - Defining Standard Operations 85853361.DOC

    Effective 07/04/02 Page 5 of 8 Rev 1

7. Save your work.

    Defining Alternate Routings

    8. Create an Alternate Name called ##ALT. 9. Navigate to the Alternates window.

    ; (N) Bills of Material > Setup > Alternates 10. Enter ##ALT and a description. ## is your unique identifier.

    11. Save your work.

     Copyright ? Oracle Corporation, 2005. All rights reserved.

    Practice - Defining Standard Operations 85853361.DOC Effective 07/04/02 Page 6 of 8 Rev 1

12. Navigate to the Routings window.

    ; (N) Bills of Material > Routings > Routings

    13. Create an alternate routing using ##ALT for item ##2010 using the table below.

    Department Description Basis Operation Resource Resource Usage Assigned

    Sequence Sequence Name Rate Units

    100 ##AutoIns 10 ##Inserter Lot 2 1 Machine

    install

    components

     20 ##Inserter Item 1 1

    200 ##ManAssy 10 ##Assblr Item .1 10 Hand install

    components

14. Add Operation Sequence 300 to your alternate routing for item ##2010. Enter your standard

    operation ##TE for Operation Sequence 300. Check the referenced checkbox.

     Copyright ? Oracle Corporation, 2005. All rights reserved.

    Practice - Defining Standard Operations 85853361.DOC

    Effective 07/04/02 Page 7 of 8 Rev 1

15. Save your work.

     Copyright ? Oracle Corporation, 2005. All rights reserved. Practice - Defining Standard Operations 85853361.DOC Effective 07/04/02 Page 8 of 8 Rev 1

Report this document

For any questions or suggestions please email
cust-service@docsford.com