    1.0 Purpose & Scope

    1.1 This procedure describes the requirements on the documentation of the

    trainings received by the project staff and trade workers of subcontractors. 2.0 Responsibilities

    2.1 The QA Manager shall be responsible for documenting and maintaining the

    training records for the project staff.

    2.2 The Construction Managers shall be responsible to ensure that the trade

    workers received the required trainings prior to the work commencement. 3.0 References

    N/A

    4.0 Actions

    4.1 The subcontractors shall provide their workers with the required trainings and

    submit the necessary training records before commencement of works. 4.2 The Construction Manager shall ensure that all the workers obtained the

    required trainings before allowing them to perform the works on site. 4.3 The project key personnel shall be subject to trainings about the project

    quality system and the project procedures related to their disciplines. 4.4 All training records, such as quality training, cleanroom protocol training and

    safety training for the project shall be copied to QAQC department for record.

     Editor-in-Charge:

    Page 2 of 3 Linda Yu

4.5 The Project Department Managers are required to disseminate quality system

    and relevant procedures to their respective team members. 5.0 Forms and Records

    5.1 Training record log

    6.0 Flow Chart

    N/A