DOC

System Engineering

By Kyle Woods,2014-05-17 14:21
13 views 0
IR/101, Pre feasibility report on design of CAPE gauge locomotive for South African Railways, March'2001. IR/102, Performance of WAP4 locomotive with 4th

     System Engineering , Locomotive Specification, Control Circuit , Haulage Capacity

    Sl Record No. Description Year No.

    1. IR/19 Investigation into the riding stability of WAMI AC locos 1968

    on S.E.R1y (Mech Engg IR No 32)

    2. IR/20 Time lost by trains due to speed restriction (ME IR No 1969

    32)

    3. IR/26 Report on the incidences of fire on electric loco Dec’1971 4. IR/28 WAM4 locomotives parallel connections of traction 1972

    motors and prevention of high Cap transformers

    5. IR/41 Investigation Report on the failures and May' 74

    defects on WCG2 locomotives (IRII-17)

    6. IR/43 Report on Fires on DC locomotives on C.Rly May' 77

    (IR/I -16/02)

    7. IR/46 Dossier on incidences of fires on 25 KV a. c. Aug'77

    electric locomotives

    8. IR/47 Report on the incidence of fires on electric Dec'77

    locomotives

    9. IR/61 Current loading of traction motor ofWAG7 Apr'97

    loco on graded section of E.R. with a load of

    58 BOXN

    10. IR/62 Report on current loading of traction motors of WAG7 Apr'97

    locomotives on graded section of Central Railway with

    load of 58 BOXN

    11. IR/63 Report on current loading of traction motor Aug' 97

    ofWAG6-7Iocomotive on graded section of

    Eastern Railway with a load of 58 BOXN

    12. IR/64 Current loading of traction motors ofWAG7 Oct'97

    locomotives on graded sections of Central

    Railway with load of 58 BOXN

    13. IR/66 Investigation Report of fire accident on locomotives Apr' 98

    NO.21049 WAG4 based at Asansol Electric Loco Shed

    of Eastern Railway.

    14. IR/67 Investigation report of fire accident on May'98

    locomotive NO.20438 W AM4 based at Ajni

    Electric Shed on Central Railway

    15. IR/68 Study on rehabilitation of electric locomotives July' 98 16. IR/69 Quality audit report of electric loco shed July' 98

    Jhansi for improving electric locomotives'

    reliability & performance

    17. IR/70 Report on panto entanglement with OHE July'98 18. IR/73 Study on train stalling of 58 BOXN hauled by single W Sept' 98

    AG7 locomotive in Nagpur and Bilaspur division of South

    Eastern Railway

    19. IR/74 Quality audit report of electric loco shed, Aarkonam, Aug'98

    S.Rly for improving electric loco reliability and

    performance of electric locomotive

    20. IR/79 Investigation report of fire accident on locomotive no Aug'98

    23553 W AG5 based at TKD Shed of Western Rly

    21. IR/88 Revision of SEC Norms Ju1'99 22. IR/89 A report on preparation of database for Electric Aug'99

    Locomotive on Indian Rlys

    23. IR/90 Wheel skidding of electric locomotive No 23142 W Sept' 99

    AG5/ET while working in Western Rly and Central Rly 24. IR/92 Recommendation on codal life of equipments of electric Dec '99

    locomotives

    25. IR/95 Fire accident on locomotive no. 20468 W AM4 based at 2002

    Itarsi Loco Shed of C. Railway.

    26. IR/97 Setting up of repair/test facilities for power electronic Aug’2002

    equipment on 3 phase electric. Locomotives

    27. IR/98 Training in use of application software, trouble shooting

    and fault diagnostic at Adtranz Switzerland IT on

    19.4.99 18.6.99

    28. IR/99 Trial to assess overloading of traction motor of WAG7 Jan’2000

    loco ( Multiple Unit on graded section of SCR.

    29. IR/101 Pre feasibility report on design of CAPE gauge March’200

    locomotive for South African Railways 1 30. IR/102 Performance of WAP4 locomotive with 4th April’2001

    step weak field arrangement.

    31. ELRS/IR/010Adding efficiency multipliers in existing electric loco Jun’2005

    8 sheds.

    32. ELRS/IR/010Investigation Report on fire in electric loco no. 23547 Jun’2005

    9 (WAG5A) on 23.07.2005

    33. ELRS/IR/011Report on Trial on adhesion performance of WAG9 locos. Oct’2005

    0

    34. RDSO/2006/Trials for measuring tractive effort of WAG9 MU with 58 Jan 2007

    EL/TR/109 box n loaded up to CC+8+2

    (Rev ‘0’)

    35. RDSO/2007/Report on Review of trip inspection of electric Jan 2007

    EL/RM/0110,(locomotives

    Rev.’0’)

    36. RDSO/2007/Issue concerning reliability/ availability of 3 phase electric Sept’ 2007

    EL/RM/0123,locomotives

    Rev.’0’

    37. RDSO/2007/Failure investigation report of journal of WAP7 electric Oct’ 2007

    EL/IR/0125(Rlocos.

    ev.’0’)

    38. RDSO/2007/Report on repair of printed Circuit Board of March 2008

    EL/IR/0127 3-ph Electric Loco.

    (Rev.0)

    39. RDSO/2009/Report on Technical Evaluation of tenders for March’ 2009

    EL/RM/0134,development of IGBT based 3ph Drive propulsion

    Rev.’0’ equipments along with assembly and commissioning on

    WAG9 and WAP7 locomotives.

    40. RDSO/2009/Report on ” Technical Evaluation of technical offer of M/s March’ 2009

    EL/RM/0135,BHEL for IGBT based 3phase Drive propulsion

    Rev.’0’ equipments along with assembly and commissioning on

    WAG9 and WAP7 class of Electric Locomotives as per

    Railway Board’s tender No. ST-2/2

Report this document

For any questions or suggestions please email
cust-service@docsford.com