DOC

Activity Report

By Joe Harris,2014-05-17 01:35
10 views 0
Draft SWOT-analysis based on the survey of present conditions and identifaction of keyA draft SWOT analysis of the area Higher Education and Research

BSR INTERREG III B

    Progress Report Activity Report

BSR INTERREG III B Activity Report

Dear Lead Partner,

Please take notice of the following when filling in the activity report:

1. Please do not change the table structure of the reporting form. The automatic

    uploading of the information into the database is not possible, if you add or delete

    cells, rows or columns.

2. Please follow the instructions given on the turquoise fields or in cursive on the white

    fields. Please delete the cursive advise in brackets on the white fields before filling in

    these fields.

3. Please try to keep the descriptions short. When appropriate, prefer bullet points to

    whole sentences.

Further information is available on www.bsrinterreg.net in the section "How to

    implement". Please read also carefully the corresponding chapters of the programme

    manual.

If you have any further questions, please do not hesitate to contact Eeva Rantama at the

    BSR Interreg III B Joint Secretariat.

Contact information:

Eeva Rantama

    Project Manager

Tel: +49 381 45484 5291

    eeva.rantama@bsrinterreg.net

BSR INTERREG III B *** Progress Report 17.05.2010 Page 1 of 12

BSR INTERREG III B

    Progress Report Activity Report (general information)

    Project name: Strategy and Action Plan for the Barents Region up to 2010/Barents 2010

    Reporting period: Number of the report: 1 01.07.2003 - 31.12.2003

    Summary description of the project Please provide a brief overall summary of the project to be published on BSR Interreg III B webpage. (maximum 2500 characters)

    (New!)

    Achievements of the project so far Please describe the main achievements of the project so far to be published on BSR Interreg III B webpage. (maximum 1500 characters)

    (New!) BSR INTERREG III B *** Progress Report 17.05.2010 Page 2 of 12

BSR INTERREG III B

    Progress Report Activity Report (general information)

    Are there any changes on the general project conditions/project set up? (e.g. partnership, key persons, schedules …)

    Please describe the main co-ordination activities that have taken place during the reporting period. (e.g. partnership contracts, organisational arrangements, meetings…)

    (New!)

BSR INTERREG III B *** Progress Report 17.05.2010 Page 3 of 12

BSR INTERREG III B

    Progress Report Activity Report (activities and outputs)

    Title of WP1 Strategy and Action Plan

    MILE-To provide the Barents Region Committee with appropriate and valuable information and Strategic focus of WP1 STONE assessments.

    A Strategy and Action Plan for the Barents region Planned results of WP1 1

    Main activities that have taken place Outputs produced during the reporting Planned activities and outputs during the reporting period period

     Activities:

     * Earlier policy and planning strategies will be

    (New!) analysed and evaluated.

     * An assessment of on-going tendencies and

    (Outputs are the immediate products of a expectations in terms of options and problems

    project’s activities. They are tangible goods in the Barents region will be launched.

    and services that the activities produce e.g. * Hearings and workshops with the aim to

    reports, written concepts, policy tools, collect information will be organised.

    strategies, new products, websites, * A Kick-off conference will be held.

    databases, seminars, training sessions.) * The development of a Barents information

    dissemination plan for the project will be

    started. The website that will be devloped will

    mainly focus on project information

    concerning organisation, planning, meetings,

    decisions, activities, info material etc.

    * Meeting with the Barents Reference group

    and one Internal partner meeting

    Output:

    * Comprehensive document with information

    on current conditions, options on future

    perspectives and analysed previous strategy

    documents.

    * A draft SWOT-analysis

    Deviation from the planned activities and outputs as well as their reasons/justifications

BSR INTERREG III B *** Progress Report 17.05.2010 Page 4 of 12

BSR INTERREG III B

    Progress Report Activity Report (activities and outputs)

    Title of WP2 Industrial Development Barents

    MILE-To facilitate cross-border industrial cooperation projects in key industrial sectors such as forestry Strategic focus of WP2 STONE (incl. Eco-tourism), Minerals and Offshore/Fishing.

    Increased market shares of the total world market, added-value in the region and improved Planned results of WP2 1 environmental conditions by the introduction of new technologies, skills development and new

    management methods.

    Main activities that have taken place Outputs produced during the reporting Planned activities and outputs during the reporting period period

     Activities:

     * Survey of key conditions in the selected

    (New!) industrial sectors such as availability of

     natural resources, logistical and other

    (Outputs are the immediate products of a infrastructure, qualified man-power, customer

    project’s activities. They are tangible goods relations and industrial facilities.

    and services that the activities produce e.g. * Identification of key actors in the selected

    reports, written concepts, policy tools, industrial sectors.

    strategies, new products, websites, * Draft SWOT-analysis based on the survey of

    databases, seminars, training sessions.) present conditions and identifaction of key

    actors aiming at an evaluation of the present

    status of the selected industrial sectors.

    Outputs:

    * Draft SWOT-analysis.

    * Priority list of industrial projects suitable for

    cross-border co-operation.

    * Priority list of key industrial actors in the

    selected industrial sectors.

    * Priority list of institutions and governmental

    agencies of relevance to the initiation of

    defined industrial projects based on the

    results from the fact-finding process and the

    SWOT-analysis.

BSR INTERREG III B *** Progress Report 17.05.2010 Page 5 of 12

BSR INTERREG III B

    Progress Report Activity Report (activities and outputs)

Deviation from the planned activities and outputs as well as their reasons/justifications

    BSR INTERREG III B *** Progress Report 17.05.2010 Page 6 of 12

BSR INTERREG III B

    Progress Report Activity Report (activities and outputs)

    Title of WP3 Network-Meetings between lecturers and researchers in the Barents region

    MILE-To generate new co-operation projects related to Research and Higher Education in the Barents Strategic focus of WP3 STONE region.

    Suggestions on how to improve the Education and Research co-operation situation in the Barents Planned results of WP3 1 region for selected areas, and to present at least 5 new co-operation projects.

    Main activities that have taken place Outputs produced during the reporting Planned activities and outputs during the reporting period period

     Analysis of current conditions and future

     perspectives for the Barents region

    (New!)

     Activities:

    (Outputs are the immediate products of a * Survey about the existing University

    project’s activities. They are tangible goods networks in the Barents region

    and services that the activities produce e.g. * A report on problems and possibilities will be

    reports, written concepts, policy tools, made

    strategies, new products, websites, * Information dissemination to different

    databases, seminars, training sessions.) stakeholders

Outputs:

    * Knowledge about the present networks

    * Knowledge about the ambitions for further

    cooperation

    * Knowledge about co-operation ideas

    * A draft SWOT analysis of the area Higher

    Education and Research

    Deviation from the planned activities and outputs as well as their reasons/justifications

BSR INTERREG III B *** Progress Report 17.05.2010 Page 7 of 12

BSR INTERREG III B

    Progress Report Activity Report (activities and outputs)

    Title of WP4 Environmental situation in the Barents region

    MILE-Prepare Action Plan to improve the Environmental situation in the Barents region concerning water Strategic focus of WP4 STONE quality and biodiversity.

    Action plan based on analysis of the environmental situation in the Barents region on water quality Planned results of WP4 1 and biodiversity as a base for future improvement.

    Main activities that have taken place Outputs produced during the reporting Planned activities and outputs during the reporting period period

     Collection of data on environmental situation

     on water quality and biodiversity.

    (New!) Identification of key areas on water quality

     and biodiversity.

    (Outputs are the immediate products of a Comparative analysis of collected data.

    project’s activities. They are tangible goods Activities:

    and services that the activities produce e.g. * Fact-finding mission to regions

    reports, written concepts, policy tools, * Collection of already existing data from each

    strategies, new products, websites, region

    databases, seminars, training sessions.) * Comparative analysis

    Outputs:

    * Identification of key areas

    * Results from comparative analysis

    * Knowledge about environmental situation in

    Barents region on water quality and

    biodiversity

    * A draft SWOT-analysis on the environmental

    situation in the Barents region

    Deviation from the planned activities and outputs as well as their reasons/justifications

BSR INTERREG III B *** Progress Report 17.05.2010 Page 8 of 12

BSR INTERREG III B

    Progress Report Activity Report (activities and outputs)

    Title of WP5 Transport and Infrastructure

    MILE-To develop communication systems and set focus on missing links in the transport infrastructure Strategic focus of WP5 STONE systems(Physical as well as Digital).

    Improved solutions for communications in the Barents region and identification of missing links and Planned results of WP5 1 malfunctions in the transport infrastructure system (Physical as well as Digital).

    Main activities that have taken place Outputs produced during the reporting Planned activities and outputs during the reporting period period

     Survey of facts about the infrastructure and

     communication system in the Barents region.

    (New!) (Physical as well as digital).

     Identification of transport and communication

    (Outputs are the immediate products of a needs for industry and citizens.

    project’s activities. They are tangible goods SWOT-analysis based on the present system

    and services that the activities produce e.g. and known plans.

    reports, written concepts, policy tools, Close co-operation with the INTERREG III B

    strategies, new products, websites, Baltic Sea project on Sustainable transport in

    databases, seminars, training sessions.) the Barents region.

    Activities:

    * Fact-finding by regional authorities and with

    help of organisations for private companies

    e.g. chambers of commerce.

    * Sub-regional work-shops.

Output:

    * A draft SWOT-analysis on Transport and

    Infrastructure.

    * Identification and priority list of interesting

    development projects.

    Deviation from the planned activities and outputs as well as their reasons/justifications

BSR INTERREG III B *** Progress Report 17.05.2010 Page 9 of 12